flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sports stadiums and arenas showcase sustainability features

Codes and Standards

Sports stadiums and arenas showcase sustainability features

Green venues save owners money, gain positive publicity.


By Peter Fabris, Contributing Editor | June 5, 2018

The newly opened $1.6 billion Mercedes-Benz Stadium in Atlanta earned LEED Platinum certification and is one of the latest sports venues to showcase sustainability.

Earning 88 out of a potential 110 points, the facility is the first sports arena to achieve the Platinum rating. Stadiums and arenas have become showcases for green design, with owners finding that they are cheaper to operate and generate positive publicity for their environmental responsibility.

The Golden 1 Center in Sacramento, home of the Sacramento Kings N.B.A. franchise, became the first LEED Platinum arena when it opened in 2016. Dozens of sports arenas and stadiums around the globe have installed solar panels, LED lighting and scoreboards, energy efficient air-conditioning and dehumidifiers, and composters.

Many use a translucent coating on windows to reduce solar heat gain. Mercedes-Benz Stadium, home to Atlanta Falcons of the N.F.L. and a Major League Soccer team, holds up to 680,000 gallons of rainwater collected from the roof.

Related Stories

| Feb 17, 2012

AGC advocates for federal procurement reform

Ensure that small business goals take into consideration actual small business capacity in relevant specialty markets.

| Feb 17, 2012

Codes not to blame for Anchorage roof collapses following heavy snows

Design or construction problems likely contributed to the collapses, according to city officials.

| Feb 17, 2012

Comment period opens March 1 for LEED 2012 update

USGBC says that LEED's strength comes from its continuous evolution.

| Feb 17, 2012

OSHA training videos on proper respirator use available online

17 short videos to help workers learn about the proper use of respirators on the job.

| Feb 17, 2012

Union/employer collaboration on the rise aimed at exceeding OSHA safety standards

Unions have learned to help employers win contracts with bids made competitive through good safety practices.

| Feb 16, 2012

Gain greater agility and profitability with ArchiCAD BIM software

White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.

| Feb 9, 2012

Initiative to sell off under-used federal property gaining momentum

The bill is similar to a White House planto cut $8 billion worth of building costs by the end of the 2012 fiscal year, and to establish a panel to identify other sites worth selling or donating to nonprofits or state and local governments.

| Feb 9, 2012

Computer tool helps engineers design roof cladding using Canada's building code

Easier to design roof cladding that can withstand winds in a given area. 

| Feb 9, 2012

Webinar focuses on lessons learned from LEED-certified industrial project

This case study will focus on strategies used to save the client money, achieve certification, and effectively market success once the project was complete.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021