SSOE Group, the global A/E and construction management firm, has promoted Vince DiPofi, PE, to be its next President and CEO. He will replace current CEO Bob Howell, who will retire in the first quarter of 2020. DiPofi officially assumes his new roles on December 4, when the company will hold its shareholders’ meeting.
DiPofi, the company’s COO and Executive Vice President, is a 35-year industry vet who has been with SSOE since 2000, when he started as Business Leader for the firm’s food group.
“For a firm like SSOE, that has enjoyed continued success for over 70 years, the role of CEO is a great responsibility,” says DiPofi. “I’m confident in the entire SSOE team’s ability to work together to continue this company’s history of innovation and great client service.”
Last August, SSOE celebrated its 70th anniversary. Howell has been with the firm since 1980, starting as a draftsman trainee. He has led SSOE since December 2014, and during his leadership tenure the Toledo, Ohio-based company has ranked among the industry’s 10 largest engineering and architecture firms, and 15 largest international engineering firms, according to BD+C’s annual GIANTS rankings.
Last December, the company stated that, since 2009—when it committed to delivering projects on schedule for lower total costs—it had saved clients more than $1 billion in project costs: at least $10 million each for 34 clients and more than $1 million each for 95 clients. The firm had also returned 95% of its fees to clients in the form of project savings over the previous five years.
DiPofi is a member of the National Society of Professional Engineers and has been a registered Professional Engineer in Ohio and Michigan since 1990. He received his Bachelor of Science from The University of Toledo in Mechanical Engineering in 1985.
At SSOE, DiPofi has been influential in fostering a culture of business development, having held previous roles as Director of Business Development, Chief Strategy Officer, and provided oversight of SSOE’s Mexico and China operations. He served as SSOE's Chairman of the Board until 2018. In his current capacity, DiPofi has executive level oversight over the firm's Advanced Technology Strategic Business Unit; Healthcare, Cmmercial, and Education practices; and its virtual design and construction team.
Related Stories
| Dec 17, 2010
Vietnam business center will combine office and residential space
The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.
| Dec 17, 2010
Toronto church converted for condos and shopping
Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.
| Dec 17, 2010
ARRA-funded Navy hospital aims for LEED Gold
The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.
| Dec 17, 2010
Arizona outpatient cancer center to light a ‘lantern of hope’
Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.
| Dec 17, 2010
Cladding Do’s and Don’ts
A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.
| Dec 17, 2010
5 Tips on Building with SIPs
Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.
| Dec 17, 2010
How to Win More University Projects
University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.
| Dec 13, 2010
Energy efficiency No. 1 priority for commercial office tenants
Green building initiatives are a key influencer when tenants decide to sign a commercial real estate lease, according to a survey by GE Capital Real Estate. The survey, which was conducted over the past year and included more than 2,220 office tenants in the U.S., Canada, France, Germany, Sweden, the UK, Spain, and Japan, shows that energy efficiency remains the No. 1 priority in most countries. Also ranking near the top: waste reduction programs and indoor air.
| Dec 7, 2010
Are green building RFPs more important than contracts?
The Request for Proposal (RFP) process is key to managing a successful LEED project, according to Green Building Law Update. While most people think a contract is the key element to a successful construction project, successfully managing a LEED project requires a clear RFP that addresses many of the problems that can lead to litigation.