flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stadium renovation plans unveiled for Boston’s National Women’s Soccer League

Sports and Recreational Facilities

Stadium renovation plans unveiled for Boston’s National Women’s Soccer League

The plans include an addition of a mixed-use space with food and beverage offerings.


By Peter Fabris, Contributing Editor | October 24, 2024
Stadium renovation plans unveiled for Boston’s National Women’s Soccer League Courtesy Stantec
Courtesy Stantec

A city-owned 75-year-old stadium in Boston’s historic Franklin Park will be renovated for a new National Women’s Soccer League team. The park, designed by Fredrick Law Olmsted in the 1880s, is the home of White Stadium, which was built in 1949 and has since fallen into disrepair. Franklin Park is conveniently located near the Green Street and Forest Hills Orange Line stops and is easily accessible by walking and biking.

The renovation will add spaces, accessibility, systems, and amenities needed to be a citywide resource and will be used as an athletic facility for Boston schools’ athletic programs. The building team will take special care to preserve White Stadium’s art deco façade as well as Franklin Park’s heritage trees and pastoral paths. Improvements to White Stadium will include roof canopies over new grandstand seating areas that will hold 10,000 spectators and the addition of a mixed-use space with food and beverage offerings that opens out to the Playstead playing fields. Called “The Grove,” the event lawn will host events such as tai chi, children’s storytelling, small performances, seasonal markets, and cultural gatherings programmed with a neighborhood advisory group.

The West Grandstand and Grove will be renovated into 75,000 sf of team areas, concessions, and fan lounges, leased by the professional team and renovated/rebuilt for their needs. The East Grandstand and field will be demolished and rebuilt by the city to accommodate a 75-yard-wide regulation field and track. It will also focus on Boston Public Schools needs with student wellness areas, locker rooms, athletic equipment storage, and school department offices.

“This project is a visionary partnership between the City of Boston, the Boston Public Schools, and Boston Unity Soccer Partners to leverage the significant investment of a professional women’s soccer team to benefit generations of Boston public schoolchildren,” said Tamara Roy, principal, Stantec.

Construction is expected to be substantially completed by March 2026.

On the building team:
Owner and/or developer: Boston Unity Soccer Club LLC
Architect: Stantec
Stadium Design Consultant: Moody Nolan
MPFP Engineer: VAV International
Electrical Engineer: ART
Structural Engineer: WSP
General Contractor/Construction Manager: N/A

Related Stories

| Jun 12, 2014

Austrian university develops 'inflatable' concrete dome method

Constructing a concrete dome is a costly process, but this may change soon. A team from the Vienna University of Technology has developed a method that allows concrete domes to form with the use of air and steel cables instead of expensive, timber supporting structures.

| Jun 11, 2014

Esri’s interactive guide to 2014 World Cup Stadiums

California-based Esri, a supplier of GIS software, created a nifty interactive map that gives viewers a satellite perspective of Brazil’s many new stadiums.

| Jun 4, 2014

Construction team named for Atlanta Braves ballpark

A joint venture between Barton Malow, Brasfield & Gorrie, Mortenson Construction, and New South Construction will build the Atlanta Braves ballpark, which is scheduled to open in early 2017. Check out the latest renderings of the plan.

| Jun 2, 2014

Parking structures group launches LEED-type program for parking garages

The Green Parking Council, an affiliate of the International Parking Institute, has launched the Green Garage Certification program, the parking industry equivalent of LEED certification.

| May 29, 2014

7 cost-effective ways to make U.S. infrastructure more resilient

Moving critical elements to higher ground and designing for longer lifespans are just some of the ways cities and governments can make infrastructure more resilient to natural disasters and climate change, writes Richard Cavallaro, President of Skanska USA Civil.

| May 22, 2014

Just two years after opening, $60 million high school stadium will close for repairs

The 18,000-seat Eagle Stadium in Allen, Texas, opened in 2012 to much fanfare. But cracks recently began to appear throughout the structure, causing to the school district to close the facility. 

| May 20, 2014

Kinetic Architecture: New book explores innovations in active façades

The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.

| May 19, 2014

What can architects learn from nature’s 3.8 billion years of experience?

In a new report, HOK and Biomimicry 3.8 partnered to study how lessons from the temperate broadleaf forest biome, which houses many of the world’s largest population centers, can inform the design of the built environment.

| May 16, 2014

Toyo Ito leads petition to scrap Zaha Hadid's 2020 Olympic Stadium project

Ito and other Japanese architects cite excessive costs, massive size, and the project's potentially negative impact on surrounding public spaces as reasons for nixing Hadid's plan.  

| May 13, 2014

First look: Nadel's $1.5 billion Dalian, China, Sports Center

In addition to five major sports venues, the Dalian Sports Center includes a 30-story, 440-room, 5-star Kempinski full-service hotel and conference center and a 40,500-square-meter athletes’ training facility and office building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021