flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stalco Construction converts Babylon, N.Y. Town Hall into history museum

Stalco Construction converts Babylon, N.Y. Town Hall into history museum

The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.


By By BD+C Staff | December 16, 2011
Stalco Construction served as general contractor for the final phase of the restoration.

Stalco Construction completed an extensive renovation and expansion of the old Babylon Town Hall in Babylon, NY, originally erected in 1917. The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.

According to Stalco Construction Principal Kevin G. Harney, “Stalco performed the final, $700,000 phase of the restoration, which encompassed construction of a two-story, 800-sf addition that houses a lobby and a hydraulic elevator, interior restorations within the original, historic structure and construction of the museum’s exhibition space.”

Stalco Construction served as general contractor for the final phase of the restoration. The project team also included historic restoration consultant and construction manager Historic Construction Management Corp. (HCMC); architect Laura Casale, AIA; structural engineer SDG Engineering LLC; and Mechanical/Plumbing/Electrical engineer Sidney B. Bowne & Son, LLP.

HCMC lead the entire restoration investigation and design throughout a five-year, phased renovation and expansion process. 

“The old town hall building underwent a multi-phased restoration.  The initial phase encompassed the complete historic assessment and treatment recommendations for the structure, followed by an extensive exterior restoration,” recalled HCMC Principal Joel Snodgrass.  “The final, second phase included construction of a historically sensitive addition, selected interior renovations, restoration/installation of museum spaces, and ADA compliance improvements.” BD+C

Related Stories

| Aug 24, 2012

Meis heads to Woods Bagot Sport

Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.

| Aug 21, 2012

Under 40 Leadership Summit slated for October 3-5 in Chicago

Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.

| Aug 21, 2012

Hong Kong’s first LEED Platinum pre-certified building opens

Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.

| Aug 21, 2012

Stellar wins four ABC Excellence In Construction awards

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.

| Aug 20, 2012

Protecting the artifacts at George H.W. Bush Presidential Library and Museum

Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.

| Aug 17, 2012

Ferreri joins PGAL as Principal

Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.

| Aug 17, 2012

Centric Architecture and PLAD Studio merge

The new firm will retain Centric Architecture as its name.

| Aug 15, 2012

MBH Architects announces new appointments

MBH Architects continues to grow, take on new clients.

| Aug 15, 2012

Architects and designers challenged in Allsteel’s reality design competition

KITS mobile app offers flexibility in planning.

| Aug 14, 2012

Leo A Daly welcomes Carl Gentilcore

Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021