flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stalco Construction converts Babylon, N.Y. Town Hall into history museum

Stalco Construction converts Babylon, N.Y. Town Hall into history museum

The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.


By By BD+C Staff | December 16, 2011
Stalco Construction served as general contractor for the final phase of the restoration.

Stalco Construction completed an extensive renovation and expansion of the old Babylon Town Hall in Babylon, NY, originally erected in 1917. The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.

According to Stalco Construction Principal Kevin G. Harney, “Stalco performed the final, $700,000 phase of the restoration, which encompassed construction of a two-story, 800-sf addition that houses a lobby and a hydraulic elevator, interior restorations within the original, historic structure and construction of the museum’s exhibition space.”

Stalco Construction served as general contractor for the final phase of the restoration. The project team also included historic restoration consultant and construction manager Historic Construction Management Corp. (HCMC); architect Laura Casale, AIA; structural engineer SDG Engineering LLC; and Mechanical/Plumbing/Electrical engineer Sidney B. Bowne & Son, LLP.

HCMC lead the entire restoration investigation and design throughout a five-year, phased renovation and expansion process. 

“The old town hall building underwent a multi-phased restoration.  The initial phase encompassed the complete historic assessment and treatment recommendations for the structure, followed by an extensive exterior restoration,” recalled HCMC Principal Joel Snodgrass.  “The final, second phase included construction of a historically sensitive addition, selected interior renovations, restoration/installation of museum spaces, and ADA compliance improvements.” BD+C

Related Stories

| Apr 3, 2012

Product Solutions

Two new PV systems; a lighter shelf; and fire alarm/emergency communication system.

| Apr 3, 2012

AIA: Commercial Flooring

Laying the foundation for good design.

| Apr 3, 2012

Blaine Brownell on innovative materials applications in architecture

Brownell, who was named a BD+C 40 Under 40 in 2006, provides insight regarding emerging material trends and the creative implementation of materials.

| Apr 3, 2012

AGC Glass to reopen shuttered plant

Shuttered since 2008, the plant produces clear and tinted float glass serving architectural glass markets.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Apr 3, 2012

SSOE acquires MEP Firm CRS Engineering & Design Consultants

The acquisition will expand SSOE’s Southeastern U.S. presence, broaden CRS’s reach to international markets, and provide both firms’ clients access to enhanced services and resources.

| Apr 3, 2012

Suffolk completes phase one of Baystate Medical Center expansion

Construction management firm awarded emergency department project for successful build of $296 million MassMutual Wing and Davis Family Heart and Vascular Center.

| Apr 3, 2012

Meyer receives RCMA's Martin A. Davis Industry Leadership Award

The Martin A. Davis Industry Leadership Award is presented annually to an individual, selected by his or her peers, who has exemplified outstanding service and made significant contributions to the roof coatings industry.

| Apr 3, 2012

Johns Manville publishes 2011 Sustainability Report

Report covers JM’s long-time sustainability focus and progress towards goals.

| Apr 3, 2012

Educational facilities see long-term benefits of fiber cement cladding

Illumination Series panels made for a trouble-free, quick installation at a cost-effective price. The design for Red Hawk Elementary School stems from the desire to create a vibrant place for kids to learn. In an effort to achieve this design, RB+B Architects selected Nichiha USA to provide a durable yet modern, contemporary exterior finish.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021