flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stalled Conference House Park pavilion renovation moving forward

Reconstruction & Renovation

Stalled Conference House Park pavilion renovation moving forward

The pavilion has been awaiting repair since storm damage in 2011 rendered the structure unsafe for the public.


By David Malone, Associate Editor | February 16, 2017

Rendering courtesy of Sage and Coombe

In 2002, the pavilion in Staten Island’s Conference House Park, which is located in an area that makes it very prone to storm damage, was rebuilt as part of a $14 million park renovation project. But not even 10 years later, in 2011, the pavilion was closed due to weather damage to the roof and deck that forced the city to deem the structure unsafe for the public. Almost six full years later, the pavilion is still closed and awaiting repair.

A $3.7 million renovation has been in place for the pavilion, but, as Curbed New York reports, a series of setbacks has kept the project from progressing. The project received funding in 2015, but stalled due to inter-agency conflict. Later, in 2016, construction was also set to begin, but was once again delayed.

However, it appears as though construction on the project will finally get underway this year, as the Department of Parks has issued an invitation for construction bids.

Once completed (if another delay is indeed avoided) the new pavilion will provide 4,200 sf of space and can be used for weddings, concerts, or other public events. Sage and Coombe designed the new pavilion.

Related Stories

Reconstruction & Renovation | Sep 30, 2020

SOM reimagines former Cook County Hospital into mixed-use destination

The project is the first phase of a proposed $1 billion redevelopment plan for the area in Chicago.

Multifamily Housing | Aug 24, 2020

Texaco’s century-old headquarters is now a luxury apartment community

After sitting vacant for nearly three decades, the former home of Texaco, Inc. has been converted into a 17-story, 286-unit apartment building in the heart of downtown Houston.

Reconstruction & Renovation | Aug 21, 2020

Reconstruction could be COVID-19’s silver lining

Existing buildings are being adapted to the ‘new normal’ for health and wellness.

Reconstruction & Renovation | Aug 20, 2020

Former jail to be reimagined and integrated into Dallas’s Harold Simmons Park

Weiss/Manfredi was selected as the design architect for the project.

Reconstruction & Renovation | Jun 8, 2020

Spacesmith will design sustainable production facilities for Upriver Studios in New York

The project will be located in Saugerties in upstate New York.

Coronavirus | Apr 9, 2020

COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital

COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital

Reconstruction & Renovation | Mar 3, 2020

Not so strange bedfellows: hybrid buildings in New York combine unlikely tenants

“Found money” for owners looking to monetize their air spaces, says FXCollaborative, which has designed several of these buildings.

Reconstruction & Renovation | Jan 16, 2020

Snøhetta’s 550 Madison Garden gains approval from NYC Planning Commission

The project previously gained approval from Manhattan Community Board 5 in December.

Reconstruction & Renovation | Nov 6, 2019

The silent giant: Reconstruction sector makes big impact on firms

More than a quarter of AEC firms that participated in the 2019 Giants 300 survey earned at least half of their total 2018 revenue from the reconstruction sector.

Reconstruction & Renovation | Oct 7, 2019

Central Park’s Lasker Rink and Pool to undergo $150 million restoration project

The project will be the largest the Central Park Conservancy has ever undertaken.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.



Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021