flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stantec to acquire Environmental Systems Design

Engineers

Stantec to acquire Environmental Systems Design

The acquisition of ESD significantly deepens Stantec’s expertise in mission critical facilities and data center design.


By Stantec | June 12, 2023
Stantec to acquire Environmental Systems Design
Photo courtesy Stantec

Stantec, a global leader in sustainable design and engineering, has signed an agreement to acquire Environmental Systems Design, Inc. (ESD), a 270-person engineering firm headquartered in Chicago. Founded in 1967, ESD has built a reputation for excellence and innovation in high-performance design with a roster of industry-leading clients. The terms of the transaction are not disclosed.

The acquisition of ESD significantly deepens Stantec’s expertise in mission critical facilities and data center design. Mission critical facilities represent a rapidly growing segment of purpose-built infrastructure that require an increased level of reliability. These facilities—spanning nearly every major industry—are designed to maintain building infrastructure, emergency dispatch, data storage, or other critical functions in the face of inclement weather and utility outages. Data centers, such as hyperscale facilities, require special, resilient design considerations developed by uniquely qualified teams with regular exposure to the evolving needs of large-scale companies. 

The acquisition of ESD expands Stantec’s mechanical, electrical, and plumbing (MEP) and structural engineering practice by 40 percent in the US. These added resources significantly deepen the firm’s smart building engineering capabilities that support the workplace of the future and the emerging trends of decarbonization, building repositioning, and adaptive reuse.

“Merging talent with ESD positions Stantec as one of the top integrated design firms in the US market,” said Leonard Castro, executive vice president and business operating unit leader for Buildings at Stantec. “Our expanded services in data center, smart building design, and high-performance buildings will offer our clients the flexible and stable facilities that meet their operational needs into the future.”

“Stantec is a top-tier firm that shares our vision to improve society through the built environment,” said Raj Gupta, executive chairman at ESD. “ESD has increased the depth and breadth of its services in recent years. Joining Stantec expands our offering globally and creates exceptional career growth opportunities for our employees.”

Critical Project Experience

ESD provides data center design services for several industry-leading technology clients. ESD was recently retained by a confidential client to provide peer review and hyperscale data center design services and subsequently engaged in multiple hyperscale data centers on its behalf across the US. Hyperscale campus developments scale from a single 500,000 square foot (20 to 30 megawatts capacity) facility to multiple facilities spanning several million square feet (300+ megawatts capacity). Multiple sites throughout the country share a baseline design with local adaptations and are designed for efficient phased buildouts without interruption to live facilities.

Additional projects in ESD’s portfolio include

  • MEP and mission critical engineering for the United Airlines Network Operations Center in Chicago, a vital component of the airline’s day-to-day operations. Building Information Modeling (BIM) was used to route new systems through the existing structure and around existing systems. ESD worked closely with the City of Chicago and provided specialized consulting services in the areas of electrical and fire alarm codes to provide a unique furniture wiring design that met all of United’s needs.
  • MEP and fire protection engineering for the 1,400,000-square-foot expansion of the Las Vegas Convention Center, one of the largest convention centers in the world. The new West Hall includes 600,000 square feet of flexible exhibition spaces with multiple infrastructure services including a variety of electrical power voltages and capacities, telecommunications, water and drainage, and natural gas. Ancillary program and support spaces include a concourse, meeting rooms, lobbies, and café/kitchen space.
  • MEP and fire protection engineering and energy modeling for Northwestern Medicine Lake Forest Hospital in Illinois. The 201-bed hospital was designed to meet future demand and modeled to achieve LEED Silver Certification. Energy conservation measures included optimizing the thermal performance of the façade while balancing the solar heat gain of the glass, external shading techniques, LED lighting, and more. ESD also reduced water-fixture use by 20 percent and domestic hot water usage by 26 percent.

Stantec has three existing offices in Chicago, for a total of five in Illinois. With a large concentration of employees in Chicago, ESD also has offices in New York City, San Francisco, and Phoenix. The acquisition will grow Stantec’s presence in Chicago to nearly 600 and to more than 2,050 in the broader US North Central region, which covers 12 states.

The acquisition is expected to close on June 30, 2023.

Related Stories

Data Centers | Oct 1, 2024

10 biggest impacts to the data center market in 2024–2025

While AI sends the data center market into the stratosphere, the sector’s accelerated growth remains impacted by speed-to-market demands, supply chain issues, and design innovation necessities.

Higher Education | Sep 30, 2024

Studio Gang turns tobacco warehouse into the new home of the University of Kentucky’s College of Design

Studio Gang has completed the Gray Design Building, the new home of the University of Kentucky’s College of Design. In partnership with K. Norman Berry Associates Architects, Studio Gang has turned a former tobacco warehouse into a contemporary facility for interdisciplinary learning and collaboration.

Warehouses | Sep 27, 2024

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.

Laboratories | Sep 26, 2024

BSL conversions: A cost-efficient method to support high-containment research

Some institutions are creating flexible lab spaces that can operate at a BSL-2 and modulate up to a BSL-3 when the need arises. Here are key aspects to consider when accommodating a rapid modulation between BSL-2 and BSL-3 space.

MFPRO+ News | Sep 24, 2024

Major Massachusetts housing law aims to build or save 65,000 multifamily and single-family homes

Massachusetts Gov. Maura Healey recently signed far-reaching legislation to boost housing production and address the high cost of housing in the Bay State. The Affordable Homes Act aims to build or save 65,000 homes through $5.1 billion in spending and 49 policy initiatives.

Mixed-Use | Sep 19, 2024

A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood

Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.

3D Printing | Sep 17, 2024

Alquist 3D and Walmart complete one of the nation’s largest free-standing, 3D-printed commercial structures

Walmart has completed one of the largest free-standing, 3D-printed commercial structures in the US. Alquist 3D printed the almost 8,000-sf, 20-foot-high addition to a Walmart store in Athens, Tenn. The expansion, which will be used for online pickup and delivery, is the first time Walmart has applied 3D printing technology at this scale. 

Retail Centers | Sep 17, 2024

Thinking outside the big box (store)

For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?

Government Buildings | Sep 17, 2024

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.

Codes and Standards | Sep 17, 2024

New California building code encourages, but does not mandate heat pumps

New California homes are more likely to have all-electric appliances starting in 2026 after the state’s energy regulators approved new state building standards. The new building code will encourage installation of heat pumps without actually banning gas heating. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021