The engineering giant Stantec is looking to gain a global foothold in water resources infrastructure through its definitive agreement to acquire MWH Global, a Broomfield, Colo.-based engineering, consulting, and construction management firm.
This is the biggest deal in Stantec’s 62-year history, according to the Edmonton Journal. Stantec confirms to BD+C that, if consummated, the acquisition would boost its annual revenue by 56% to 4.5 billion Canadian dollars (the equivalent of US$3.47 billion).
With 6,800 employees and 187 offices in 26 countries, MWH would also give Stantec a bigger presence in key markets that include the United Kingdom, Australia, New Zealand, South and Central America, and the Middle East. With this merger, Stantec—which is based in Edmonton, Alberta—would be generating 70% of its annual revenue from outside of Canada.
“It’s really a step into another era for us,” Bob Gomes, Stantec’s CEO, told the Journal. “But I don’t want to call it transformational because that sounds risky and it sounds like it’s lucky or it just happened. This is a firm we’ve known for a number of years.”
In this agreement, which both companies’ boards have signed off on, Stantec is paying cash for MWH’s stock. After taking into account assumed debt (estimated to equal 9.5 times MWH’s adjusted cash flow for 2015), the value of this deal is expected to be around US$795 million.
Stantec is financing the merger with equity financing—which includes a C$525 million public offering of 17.36 million subscription receipts priced at C$30.25 each—along with its C$800 million revolving credit facility, and C$450 million in non-revolving debt. CIBC World Markets and RBC Dominion Securities are underwriting the equity offer.
(Acquiring companies sometimes prefer offering subscription receipts—which automatically entitle the holder to receive the equivalent security of the buyer once the acquisition closes—to ensure they have the cash needed to complete the deal in advance of closing.)
Through synergies that would include leveraging its existing back-office functions, Stantec expects the merger produce savings of about $25 million annually by 2017. Neither company provided cost-saving details.
Stantec's growth strategy under CEO Bob Gomes is to expand its global footprint and diversity its services platforms. Image: Edmonton Journal
Stantec, which before this agreement had more than 15,000 employees in over 250 locations worldwide, says the rationale for this acquisition revolves around a growth strategy that positions the company to expand its geographic footprint beyond North America and to diversify its services platform.
MWH has worked on some of the more technically complex water and natural resource projects in the world, including the Panama Canal Third Set of Locks project. Hydroworld.com notes that MWH has been involved as well in the development and rehabilitation of numerous hydroelectric projects worldwide, such as Pakistan’s 102-MW Gulpur and 4,500-MW Diamer Bhasha dams, Malaysia’s 1,400-MW Baleh, and Argentina’s 1,890-MW Salto Grande.
Stantec expects this combination to build on MWH’s position as a prominent design firm within the global water market.
“The Engineering and Technical Services offered by MWH to the Energy and Industry sector are expected to add global capabilities in water-related design services to Stantec’s key hydro-power, oil and gas, mining, and industrial clients,” the company said in its prepared statement about the acquisition.
Stantec went on to speculate that MWH’s global client portfolio should generate cross-selling opportunities for Stantec’s Energy & Resources and Buildings & Environmental Services businesses.
Members of MWH’s management team, including presidents of key business units, will be joining Stantec after the acquisition closes. MWH’s chairman and CEO Alan Krause, and its CFO David Barnes, are also joining Stantec, although their roles and titles have not been announced publicly yet.
Barnes told the Boulder (Colo.) Daily Camera that MWH had spent much of the past year evaluating its capital structure and its ability to grow as an employee-owned firm. From that analysis, he said that MWHs managers concluded that merging with a larger, publicly traded entity would give it access to much-needed capital.
This deal still must be approved by at least two-thirds of MWH’s shareholders, who will vote on it in April. The acquisition also requires government approval. If all goes as planned the acquisition should be completed by the second quarter of this year.
Related Stories
| Nov 11, 2010
USGBC certifies more than 1 billion square feet of commercial space
This month, the total footprint of commercial projects certified under the U.S. Green Building Council’s LEED Green Building Rating System surpassed one billion square feet. Another six billion square feet of projects are registered and currently working toward LEED certification around the world. Since 2000, more than 36,000 commercial projects and 38,000 single-family homes have participated in LEED.
| Nov 10, 2010
$700 million plan to restore the National Mall
The National Mall—known as America’s front yard—is being targeted for a massive rehab and restoration that could cost as much as $700 million (it’s estimated that the Mall has $400 million in deferred maintenance alone). A few of the proposed projects: refurbishing the Grant Memorial, replacing the Capitol Reflecting Pool with a smaller pool or fountain, reconstructing the Constitution Gardens lake and constructing a multipurpose visitor center, and replacing the Sylvan Theater near the Washington Monument with a new multipurpose facility.
| Nov 9, 2010
Just how green is that college campus?
The College Sustainability Report Card 2011 evaluated colleges and universities in the U.S. and Canada with the 300 largest endowments—plus 22 others that asked to be included in the GreenReportCard.org study—on nine categories, including climate change, energy use, green building, and investment priorities. More than half (56%) earned a B or better, but 6% got a D. Can you guess which is the greenest of these: UC San Diego, Dickinson College, University of Calgary, and Dartmouth? Hint: The Red Devil has turned green.
| Nov 9, 2010
12 incredible objects being made with 3D printers today
BD+C has reported on how 3D printers are attracting the attention of AEC firms. Now you can see how other creative types are utilizing this fascinating printing technology. Among the printed items: King Tut’s remains, designer shoes, and the world’s smallest Rubik’s Cube.
| Nov 9, 2010
U.S. Army steps up requirements for greening building
Cool roofs, solar water heating, and advanced metering are among energy-efficiency elements that will have to be used in new permanent Army buildings in the U.S. and abroad starting in FY 2013. Designs for new construction and major renovations will incorporate sustainable design and development principles contained in ASHRAE 189.1.
| Nov 9, 2010
Designing a library? Don’t focus on books
How do you design a library when print books are no longer its core business? Turn them into massive study halls. That’s what designers did at the University of Amsterdam, where they transformed the existing 27,000-sf library into a study center—without any visible books. About 2,000 students visit the facility daily and encounter workspaces instead of stacks.
| Nov 9, 2010
Turner Construction report: Green buildings still on the agenda
Green buildings continue to be on the agenda for real estate owners, developers, and corporate owner-occupants, according to the Turner 2010 Green Building Market Barometer. Key findings: Almost 90% of respondents said it was extremely or very likely they would incorporate energy-efficiency improvements in their new construction or renovation project, and 60% expected to incorporate improvements to water efficiency, indoor environmental quality, and green materials.
| Nov 5, 2010
New Millennium’s Gary Heasley on BIM, LEED, and the nonresidential market
Gary Heasley, president of New Millennium Building Systems, Fort Wayne, Ind., and EVP of its parent company, Steel Dynamics, Inc., tells BD+C’s Robert Cassidy about the Steel Joist Manufacturer’s westward expansion, its push to create BIM tools for its products, LEED, and the outlook for the nonresidential construction market.
| Nov 3, 2010
First of three green labs opens at Iowa State University
Designed by ZGF Architects, in association with OPN Architects, the Biorenewable Research Laboratory on the Ames campus of Iowa State University is the first of three projects completed as part of the school’s Biorenewables Complex. The 71,800-sf LEED Gold project is one of three wings that will make up the 210,000-sf complex.
| Nov 3, 2010
Park’s green education center a lesson in sustainability
The new Cantigny Outdoor Education Center, located within the 500-acre Cantigny Park in Wheaton, Ill., earned LEED Silver. Designed by DLA Architects, the 3,100-sf multipurpose center will serve patrons of the park’s golf courses, museums, and display garden, one of the largest such gardens in the Midwest.