Stellar, an architecture, engineering, construction and mechanical services firm, completed the renovation and expansion of St. Mark’s Episcopal Church and Day School.
The project united the school campus and church campus, previously divided by Oxford Avenue, and included a 1,200-sf chapel expansion, a new 10,000-sf commons building, and 7,400-sf of new covered walkways and a drop-off pavilion.
Construction began in June 2011 for the project, which was funded by a capital campaign titled “We are One.” The church and school remained open throughout construction, requiring a carefully orchestrated multi-phased approach.
Stellar worked alongside the project’s architecture firm, Richard Skinner & Associates, and the owner’s representative, Cobb Clark Enterprises (CCE), providing full construction management services for the project. Stellar has extensive experience building faith-based facilities, including Hendricks Avenue Baptist Church, San Jose Episcopal Day School, Southpoint Community Church, the Jewish Community Alliance, First Baptist Church of Middleburg, Christ Episcopal Church and more. +
Related Stories
| Mar 14, 2012
Plans for San Francisco's tallest building revamped
The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.
| Mar 14, 2012
Hyatt joins Thornton Tomasetti as VP in Chicago
A forensic specialist, Hyatt has more than 10 years of experience performing investigations of structural failures throughout the U.S.
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 13, 2012
China's high-speed building boom
A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.
| Mar 13, 2012
Commercial glazer Harmon expanding into Texas
Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.
| Mar 13, 2012
Worker office space to drop below 100-sf in five years
The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.
| Mar 12, 2012
Improving the performance of existing commercial buildings: the chemistry of sustainable construction
Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.
| Mar 9, 2012
2012 Giants 300 survey due Friday, April 13
See how your firm ranks among the AEC industry leaders.