Stellar, an architecture, engineering, construction and mechanical services firm, has won four Excellence in Construction awards from the Florida First Coast Chapter of the Associated Builders and Contractors (ABC).
ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories. Evaluation criteria include personnel management, quality control, scheduling, value analysis, obstacles overcome in the course of the project, and more.
Winners were recognized August 10 at an awards celebration at the Omni Hotel Jacksonville on the Riverwalk. All four of Stellar’s nominations won awards. The winning projects are:
Joint Base Myer-Henderson Hall
Stellar completed design and construction of the 65,000-sf addition and renovation to the Marine Corps Exchange (MCX) at Joint Base Myer-Henderson Hall in Alexandria, Virginia. The MCX, a general merchandise retail store, remained open for business throughout construction. Extensive subsurface foundations and underpinning for existing structures immediately adjacent to the project further challenged the construction sequencing. Stellar began work in April 2010 and completed the project October 2011.
Leilehua Golf Course
Serving as design-builder, Stellar renovated Leilehua Golf Course, a military-owned public course on the Hawaiian Island of Oahu. The project brought the nearly 70-year-old course up to United States Golf Association standards. The course is now being hailed as one of the military’s top courses worldwide. Construction began January 2011 and was complete March 2012.
St. Mark’s Episcopal Church and Day School
Stellar provided pre-construction and construction management services for the renovation and expansion of St. Mark’s Episcopal Church and Day School. The project united the school campus and church campus, previously divided by Oxford Avenue, and included creation of a new campus green; addition and renovation of the 1968 vintage chapel; a new 10,000-sf commons building; and 7,400-sf of new covered walkways and a drop-off pavilion. Construction began June 2011 and was complete May 2012.
Warrior Zone
Stellar provided architectural, engineering and construction services for a state-of-the-art recreational center called the Warrior Zone, located at Joint Base Lewis-McChord near Tacoma, Washington. Construction began on the 29,000-sf building in September 2010 and was complete October 2011. Stellar worked with the military’s Morale, Welfare, & Recreation branch to help develop the concept for this high-tech facility. In additional to a theatre, restaurant, and billiards, entertainment includes online games played individually or remotely with others using Alienware computers. +
Related Stories
Green | Apr 8, 2024
LEED v5 released for public comment
The U.S. Green Building Council (USGBC) has opened the first public comment period for the first draft of LEED v5. The new version of the LEED green building rating system will drive deep decarbonization, quality of life improvements, and ecological conservation and restoration, USGBC says.
Codes and Standards | Apr 8, 2024
Boston’s plans to hold back rising seawater stall amid real estate slowdown
Boston has placed significant aspects of its plan to protect the city from rising sea levels on the actions of private developers. Amid a post-Covid commercial development slump, though, efforts to build protective infrastructure have stalled.
Sustainability | Apr 8, 2024
3 sustainable design decisions to make early
In her experience as an architect, Megan Valentine AIA, LEED AP, NCARB, WELL AP, Fitwel, Director of Sustainability, KTGY has found three impactful sustainable design decisions: site selection, massing and orientation, and proper window-to-wall ratios.
Brick and Masonry | Apr 4, 2024
Best in brick buildings: 9 projects take top honors in the Brick in Architecture Awards
The Ace Hotel Toronto, designed by Shim-Sutcliffe Architects, and the TCU Music Center by Bora Architecture & Interiors are among nine "Best in Class" winners and 44 overall winners in the Brick Industry Association's 2023 Brick in Architecture Awards.
Retail Centers | Apr 4, 2024
Retail design trends: Consumers are looking for wellness in where they shop
Consumers are making lifestyle choices with wellness in mind, which ignites in them a feeling of purpose and a sense of motivation. That’s the conclusion that the architecture and design firm MG2 draws from a survey of 1,182 U.S. adult consumers the firm conducted last December about retail design and what consumers want in healthier shopping experiences.
Healthcare Facilities | Apr 3, 2024
Foster + Partners, CannonDesign unveil design for Mayo Clinic campus expansion
A redesign of the Mayo Clinic’s downtown campus in Rochester, Minn., centers around two new clinical high-rise buildings. The two nine-story structures will reach a height of 221 feet, with the potential to expand to 420 feet.
Sports and Recreational Facilities | Apr 2, 2024
How university rec centers are evolving to support wellbeing
In a LinkedIn Live, Recreation & Wellbeing’s Sadat Khan and Abby Diehl joined HOK architect Emily Ostertag to discuss the growing trend to design and program rec centers to support mental wellbeing and holistic health.
Architects | Apr 2, 2024
AE Works announces strategic acquisition of WTW Architects
AE Works, an award-winning building design and consulting firm is excited to announce that WTW Architects, a national leader in higher education design, has joined the firm.
Office Buildings | Apr 2, 2024
SOM designs pleated façade for Star River Headquarters for optimal daylighting and views
In Guangzhou, China, Skidmore, Owings & Merrill (SOM) has designed the recently completed Star River Headquarters to minimize embodied carbon, reduce energy consumption, and create a healthy work environment. The 48-story tower is located in the business district on Guangzhou’s Pazhou Island.
K-12 Schools | Apr 1, 2024
High school includes YMCA to share facilities and connect with the broader community
In Omaha, Neb., a public high school and a YMCA come together in one facility, connecting the school with the broader community. The 285,000-sf Westview High School, programmed and designed by the team of Perkins&Will and architect of record BCDM Architects, has its own athletic facilities but shares a pool, weight room, and more with the 30,000-sf YMCA.