flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stellar wins four ABC Excellence In Construction awards

Stellar wins four ABC Excellence In Construction awards

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.


By Posted by Tim Gregorski, Senior Editor | August 21, 2012
Dwyn Taylor (eft), Vice President of Stellar, accepts an award at the ABC ceremo
Dwyn Taylor (eft), Vice President of Stellar, accepts an award at the ABC ceremony.

Stellar, an architecture, engineering, construction and mechanical services firm, has won four Excellence in Construction awards from the Florida First Coast Chapter of the Associated Builders and Contractors (ABC).

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories. Evaluation criteria include personnel management, quality control, scheduling, value analysis, obstacles overcome in the course of the project, and more.

Winners were recognized August 10 at an awards celebration at the Omni Hotel Jacksonville on the Riverwalk. All four of Stellar’s nominations won awards. The winning projects are:
 
Joint Base Myer-Henderson Hall
Stellar completed design and construction of the 65,000-sf addition and renovation to the Marine Corps Exchange (MCX) at Joint Base Myer-Henderson Hall in Alexandria, Virginia. The MCX, a general merchandise retail store, remained open for business throughout construction. Extensive subsurface foundations and underpinning for existing structures immediately adjacent to the project further challenged the construction sequencing. Stellar began work in April 2010 and completed the project October 2011.
 
Leilehua Golf Course
Serving as design-builder, Stellar renovated Leilehua Golf Course, a military-owned public course on the Hawaiian Island of Oahu. The project brought the nearly 70-year-old course up to United States Golf Association standards. The course is now being hailed as one of the military’s top courses worldwide. Construction began January 2011 and was complete March 2012.
 
St. Mark’s Episcopal Church and Day School

Stellar provided pre-construction and construction management services for the renovation and expansion of St. Mark’s Episcopal Church and Day School. The project united the school campus and church campus, previously divided by Oxford Avenue, and included creation of a new campus green; addition and renovation of the 1968 vintage chapel; a new 10,000-sf commons building; and 7,400-sf of new covered walkways and a drop-off pavilion. Construction began June 2011 and was complete May 2012.
 
Warrior Zone
Stellar provided architectural, engineering and construction services for a state-of-the-art recreational center called the Warrior Zone, located at Joint Base Lewis-McChord near Tacoma, Washington. Construction began on the 29,000-sf building in September 2010 and was complete October 2011. Stellar worked with the military’s Morale, Welfare, & Recreation branch to help develop the concept for this high-tech facility. In additional to a theatre, restaurant, and billiards, entertainment includes online games played individually or remotely with others using Alienware computers. +

Related Stories

Architects | Oct 20, 2022

Woolpert acquires Sheehan Nagle Hartray Architects, global experts in mission critical design

Woolpert has acquired Sheehan Nagle Hartray Architects, a full-service architecture firm that specializes in mission critical and technically challenging projects, interior design and predesign services for commercial, civic and education clients. SNHA has offices in Chicago and London.

Mixed-Use | Oct 20, 2022

ROI on resilient multifamily construction can be as high as 72%

A new study that measured the economic value of using FORTIFIED Multifamily, a voluntary beyond-code construction and re-roofing method developed by the Insurance Institute for Business & Home Safety (IBHS), found the return can be as high as 72%.

40 Under 40 | Oct 19, 2022

Meet the 40 Under 40 class of 2022

Each year, the editors of Building Design+Construction honor 40 architects engineers, contractors, and real estate developers as BD+C 40 Under 40 awards winners. These AEC professionals are recognized for their career achievements, passion for the AEC profession, involvement with AEC industry organizations, and service to their communities.

BAS and Security | Oct 19, 2022

The biggest cybersecurity threats in commercial real estate, and how to mitigate them

Coleman Wolf, Senior Security Systems Consultant with global engineering firm ESD, outlines the top-three cybersecurity threats to commercial and institutional building owners and property managers, and offers advice on how to deter and defend against hackers. 

Designers | Oct 19, 2022

Architecture Billings Index moderates but remains healthy

For the twentieth consecutive month architecture firms reported increasing demand for design services in September, according to a new report today from The American Institute of Architects (AIA).

Building Team | Oct 18, 2022

Brasfield & Gorrie chairman’s home vandalized by anti-development activists

Activists vandalized the home and vehicles of Miller Gorrie, chairman of Birmingham-based Brasfield & Gorrie, in protest of a planned $90 million, 85-acre police, fire and public safety training center in Atlanta.

Mixed-Use | Oct 18, 2022

Mixed-use San Diego tower inspired by coastal experience and luxury travel

The new 525 Olive mixed use San Diego tower was inspired by the coastal experience and luxury travel.

University Buildings | Oct 18, 2022

A carbon-neutral-ready university campus opens in Hong Kong

In early September, the Hong Kong University of Science and Technology (HKUST) officially opened its new, KPF-designed campus in Nansha, Guangzhou (GZ).

Market Data | Oct 17, 2022

Calling all AEC professionals! BD+C editors need your expertise for our 2023 market forecast survey

The BD+C editorial team needs your help with an important research project. We are conducting research to understand the current state of the U.S. design and construction industry.

Codes and Standards | Oct 17, 2022

Ambitious state EV adoption goals put pressure on multifamily owners to provide chargers

California’s recently announced ban on the sale of new gas-powered vehicles starting in 2035—and New York’s recent decision to follow suit—are putting pressure on multifamily property owners to install charging stations for tenants.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021