The Eastside Memorial Early College High School and International High School, designed by Perkins+Will, will offer a STEM-focused curriculum that will provide specialized education for students with little to no proficiency in the English language.
The school, located in Austin, Texas, will sit on the site of the original L.C. Anderson High School, a historic African American high school that closed in 1971 following federal desegregation. The new facility will blend the old and new by incorporating elements of the original structure into the design scheme. The original, mid-century entrance, band hall, choir room, cafeteria, and an original classroom wing will all be preserved and rebuilt.
Courtesy Perkins+Will.
The entrance to the former location of the gym will become a community center entrance with a gallery that tells the stories of L.C. Anderson High School’s history. The gallery will include a timeline of the former school’s history, legacy medallions, and display cabinets for objects of historical significance.
See Also: University of Miami design/build program receives new immersive-learning facility
The low-profile red-brick building will be complemented by a new, taller section built primarily with metal and glass. The taller, four-story section of the building will feature learning space and student-focused classrooms. The school will feature maker labs, two gymnasiums, a health science lab, and a multi-use outdoor classroom courtyard with a performance stage, quiet reflection areas, and sensory gardens.
Courtesy Perkins+Will.
The $80-million project represents the first ground up high school in Austin Independent School District in almost 20 years. The education facility will make use of passive heating and cooling, natural daylighting, an its proximity to public transportation and bicycle routes in an effort to achieve LEED Silver certification.
The school is slated for completion in 2021.
Courtesy Perkins+Will.
Courtesy Perkins+Will.
Related Stories
| Dec 16, 2013
Irving, Texas building state’s second net-zero school
Lee Elementary School, scheduled to open in fall 2014, will be net-zero-ready, and if the school board decides to sell district bonds and allow the purchase of additional solar panels, will be a true net-zero facility.
| Dec 13, 2013
Safe and sound: 10 solutions for fire and life safety
From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies.
| Dec 10, 2013
16 great solutions for architects, engineers, and contractors
From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.
| Dec 9, 2013
Tips for designing higher education's newest building type: the learning commons
In this era of scaled-down budgets, maximized efficiencies, new learning methods and social media’s domination of face time, college and university campuses are gravitating toward a new space type: the learning commons.
| Dec 5, 2013
Exclusive BD+C survey shows reaction to Sandy Hook tragedy
More than 60% of AEC professionals surveyed by BD+C said their firms experienced heightened interest in security measures from school districts they worked with.
| Nov 27, 2013
Exclusive survey: Revenues increased at nearly half of AEC firms in 2013
Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 27, 2013
University reconstruction projects: The 5 keys to success
This AIA CES Discovery course discusses the environmental, economic, and market pressures affecting facility planning for universities and colleges, and outlines current approaches to renovations for critical academic spaces.
| Nov 26, 2013
Construction costs rise for 22nd straight month in November
Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.