flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.


By Posted by Tim Gregorski, Senior Editor | May 9, 2012
Stoddert is one of 78 schools spanning 29 states to receive the recognition.
Stoddert is one of 78 schools spanning 29 states to receive the recognition.

The Washington, DC office of Perkins Eastman joined the students, faculty, staff, and community of Stoddert Elementary School; the Department of General Services; and DC Public Schools in celebrating the school’s recognition for environmental sustainability with a first-ever US Department of Education Green Ribbon School award. Stoddert is one of 78 schools spanning 29 states to receive the recognition.

Designed as both a high performance, healthy, and sustainable environment and as a teaching tool, Stoddert Elementary School and Community Center enhances learning and inspires environmental stewardship, as well as serving as an inspiration for the entire community. The school, certified LEED for Schools Gold, enhances learning by optimizing acoustics, enhancing indoor air quality, providing for thermal control/comfort, providing pervasive natural light, and by actively engaging the students and community in understanding how the design conserves resources. Stoddert is first school in the District of Columbia to be fully served by a ground source heating and cooling (geothermal) system.

An interactive kiosk with content also available online, enables Stoddert’s students to analyze the building’s use of energy, water, and other resources.  A student-led Energy Patrol guides tours of the building empowering students to teach what they have learned. +

Related Stories

| Jul 18, 2012

Green expert Kats joins GreenWizard as an advisor

Kats' role is to help further expand GreenWizard’s impact in the sustainable construction industry.

| Jul 18, 2012

Construction employment stagnates in June

Lack of hiring in construction combined with job growth elsewhere threatens to create skilled-labor gap once contractors are ready to hire again.

| Jul 18, 2012

Legat & Kingscott relocates architecture/interior design office

Move enables the architecture/interior design firm to better serve its expanding clientele.

| Jul 18, 2012

Alcoa appoints Hunter Architectural Manager

Hunter to operate with the goal of driving specification, new product adoption and overall demand for the Alcoa BCS North America product range.

| Jul 17, 2012

AIA and Architecture for Humanity select Disaster Response Grant recipients

Awards help each group implement their locally driven preparedness project in the second half of the year.  

| Jul 17, 2012

KM/Plaza changes name to Plaza Construction

Lands new projects including the Perry South Beach Hotel and Dadeland Mall Kendall Wing Expansion.

| Jul 17, 2012

Dr. Phillips Charities Headquarters Building receives LEED Silver

The building incorporates sustainable design features, environmentally-friendly building products, energy efficient systems, and environmentally sensitive construction practices.

| Jul 16, 2012

BD+C Under 40 Leadership Summit scheduled

Attendee registration for U40 Summit II now open.

| Jul 16, 2012

Construction spending at 2 ½ year peak

Construction economist Ken Simonson says that four private nonresidential categories each posted 12-month spending increases of more than 25%: power and energy construction, 35%; hotels, 29%; educational and manufacturing, 27% apiece.

| Jul 16, 2012

Chen named design director at Heery

Chen comes to Heery from his own firm, Mark Chen Architect, a design and planning consulting firm, based in New York City, whose recent work includes large-scale planning studies for mixed-use projects.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021