flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.


By Posted by Tim Gregorski, Senior Editor | May 9, 2012
Stoddert is one of 78 schools spanning 29 states to receive the recognition.
Stoddert is one of 78 schools spanning 29 states to receive the recognition.

The Washington, DC office of Perkins Eastman joined the students, faculty, staff, and community of Stoddert Elementary School; the Department of General Services; and DC Public Schools in celebrating the school’s recognition for environmental sustainability with a first-ever US Department of Education Green Ribbon School award. Stoddert is one of 78 schools spanning 29 states to receive the recognition.

Designed as both a high performance, healthy, and sustainable environment and as a teaching tool, Stoddert Elementary School and Community Center enhances learning and inspires environmental stewardship, as well as serving as an inspiration for the entire community. The school, certified LEED for Schools Gold, enhances learning by optimizing acoustics, enhancing indoor air quality, providing for thermal control/comfort, providing pervasive natural light, and by actively engaging the students and community in understanding how the design conserves resources. Stoddert is first school in the District of Columbia to be fully served by a ground source heating and cooling (geothermal) system.

An interactive kiosk with content also available online, enables Stoddert’s students to analyze the building’s use of energy, water, and other resources.  A student-led Energy Patrol guides tours of the building empowering students to teach what they have learned. +

Related Stories

| Nov 17, 2011

Hollister Construction Services renovating bank in Union City, N.J.

Project is part of a series of ground-up construction and renovation assignments.

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 16, 2011

Architecture Billings Index moves upward

The Architecture Billings Index climbed nearly three points in October. 

| Nov 16, 2011

CRSI recommends return to inch-pound markings

The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014. 

| Nov 16, 2011

John Patelski joins Ghafari as executive vice president

As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021