flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Structural steel buildings specification available for second public review

Building Materials

Structural steel buildings specification available for second public review

Next year's specification open for comments until Sept. 21


By Peter Fabris, Contributing Editor | August 28, 2015

Blue Grass Chemical Agent-Destruction Pilot Plant Structural Steel. Photo: PEO ACWA/Creative Commons

The current draft of the 2016 AISC Specification for Structural Steel Buildings is now available for a second public review.

Public review comments are welcome until September 21, 2015 on any new revisions that have been made since the first public review draft was posted in the spring. The draft Specification and a comment form are available for download on the AISC website

Hard copies are also available (for a $35 charge) by calling 312.670.5411.

Related Stories

75 Top Building Products | Dec 16, 2019

Top Flooring Products for 2019

Tarkett’s aviation-inspired flooring collection and J+J Flooring’s textile composite flooring are among the four new commercial flooring products to make Building Design+Construction’​s 2019 101 Top Products report. 

75 Top Building Products | Dec 12, 2019

Top Building Envelope Products for 2019

Sto's beetle-inspired exterior coating and Dörken Systems' UV-resistant vapor-permeable barrier are among the 28 new building envelope products to make Building Design+Construction's 2019 101 Top Products report. 

| Sep 13, 2019

ABC Supply Co. opens a branch in Sharonville, Ohio

ABC Supply Co. opens a branch in Sharonville, Ohio

Building Materials | Nov 9, 2018

As trade war heats up, long-term impact is anyone’s guess

Seven months into Trump’s trade war, the jury is still out.

Sponsored | Building Materials | Aug 17, 2018

Creating an identity for the New England Conservatory Student Life and Performance Center

The first New England Conservatory building to be added in 60 years presents a singular vision.

Sponsored | Building Materials | Aug 1, 2018

Building for now... and the future

Metal building systems are often selected for large-sized structures, and with good reason.

Office Buildings | Jul 25, 2018

New study on occupant comfort advances Saint Gobain’s design approach for renovation and new construction

The building products giant gauges its employees’ perceptions of old and new headquarters environments.

Great Solutions | Jul 13, 2018

Fungus may be the key to colonizing mars

A Cleveland-based architect and a NASA Ames researcher have a novel idea for building on Mars.

| May 30, 2018

Accelerate Live! talk: T3 mass timber office buildings

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), architect and mass timber design expert Steve Cavanaugh tells the story behind the nation’s newest—and largest—mass timber building: T3 in Minneapolis.

boombox1
boombox2
native1

More In Category


Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



Glass and Glazing

The next generation of thermal glazing: How improving U-value can yield energy savings and reduce carbon emissions

The standards for energy-efficient construction and design have been raised. Due to the development of advanced low-e coatings for the interior surface and vacuum insulating technologies, architects now have more choices to improve U-values wherever enhanced thermal performance is needed to create eco-friendly spaces. These options can double or even triple thermal performance, resulting in annual energy savings and a positive return on carbon.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021