Structure Tone, a global construction services firm with annual revenues of over $3 billion, will pay a $55 million forfeiture after pleading guilty to felony charges. The lawsuit in the State Supreme Court, in Manhattan, alleged that the New York-based firm had its subcontractors, including electrical, drywall, and plumbing subs, inflate bills for the company's clients. The work in question included jobs for Bank of America, Moody's, Proskauer Rose, Bloomberg, and other customers from 2005 to 2009.
A report in the New York Times indicates that Structure Tone pled guilty to one count of falsifying business records in the first degree, a felony. David Szuchman, the chief of investigations for the district attorney, says Structure Tone became aware of the investigation in 2010 and put new safeguards in place; Szuchman's office continues to monitor the firm's business records and will do so for three years.
When functioning as a CM, Structure Tone asked subs to put unnecessary contingencies in an addendum called "Rider B," which was unknown to Structure Tone's clients. Execs also asked for discounts from subs on lump sum contracts, when the firm was working as a GC.
The company issued a statement as follows:
“The record-keeping issues, which form the basis of this agreement, date back to the period 2005 to 2009, and we have fully cooperated with authorities from the beginning. The financial position of our company — which generates $3 billion annually in revenue — continues to be strong. Long before this process began, we strengthened our compliance protocols to improve transparency.”
Related Stories
| May 10, 2012
Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond
Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.
| May 10, 2012
Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction
Certification for existing buildings under these two rating programs has overtaken that for new construction.
| May 10, 2012
Chapter 4 Business Case for High-Performance Reconstructed Buildings
Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.
| May 10, 2012
Chapter 3 How Building Technologies Contribute to Reconstruction Advances
Building Teams are employing a wide variety of components and systems in their reconstruction projects.
| May 10, 2012
Chapter 2 Exemplary High-Performance Reconstruction Projects
Several case studies show how to successfully renovate existing structures into high-performance buildings.
| May 9, 2012
Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings
As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.
| May 9, 2012
International green building speaker to keynote Australia’s largest building systems trade show
Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.
| May 9, 2012
Tishman delivers Revel six weeks early
Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.
| May 9, 2012
Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award
Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.
| May 9, 2012
Shepley Bulfinch given IIDA Design award for Woodruff Library?
The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.