Chicago-based Studio Gang Architects has been commissioned to design the new Gilder Center for Science, Education and Innovation at the American Museum of Natural History in New York. The $325 million project will include 218,000 sf of new and existing space, ArchDaily reports.
“I was immediately struck by the immense range of work the museum is already doing as an educational facility to reach learners of all ages,” said Jeanne Gang, Founder and Design Principal of Studio Gang. “This project and collaboration with the Museum is incredibly important to me and my entire team. The Gilder Center’s holistic mission closely aligns with Studio Gang’s interdisciplinary practice of integrating architecture, nature, science, and art. Designing spaces that facilitate interaction between science, education, and exhibition experiences will make possible the learning the new Gilder Center aspires to generate.”
The opening of the new space is set to coincide with the museum's 150th anniversary in 2019-2020. Ralph Appelbaum of Ralph Appelbaum Associates, Designer of the museum's exhibits in the Rose Center for Earth and Space, the fourth-floor fossil halls, and the Hall of Biodiversity, will design the exhibitions for the Gilder Center.
Related Stories
| Nov 29, 2011
Turner Construction establishes partnership with Clark Builders
Partnership advances growth in the Canadian marketplace.
| Nov 29, 2011
AIA launches stalled projects database
To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.
| Nov 28, 2011
Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.
Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.
| Nov 28, 2011
Armstrong acquires Simplex Ceilings
Simplex will become part of the Armstrong Building Products division.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 23, 2011
Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas
Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 22, 2011
Corporate America adopting revolutionary technology
The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector.
| Nov 22, 2011
Report finds that L.A. lags on solar energy, offers policy solutions
Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.