flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

This is Studio Gang's first design project in Canada

Urban Planning

This is Studio Gang's first design project in Canada

The building’s hexagonal façade will provide passive solar heating and cooling.


By John Caulfield, Senior Editor | July 6, 2018

One Delisle is a 522-ft-tall tower with 263 residences that Slate Asset Management is proposing to build on one of 10 properties it has bought in midtown Toronto. Image: Norm Li, Courtesy of Studio Gang

Since 2013, the real estate investment firm Slate Asset Management has been acquiring properties in midtown Toronto. It currently holds 10, including all four corners at the intersection of Yonge Street (Toronto’s main drag) and St. Clair Avenue. On the southwest corner, Slate has devised a block plan with a mixed-used tower designed by Studio Gang, which is the architectural firm’s first project in Canada.

Yesterday, Slate and Studio Gang presented information about that block plan and tower during a community meeting of stakeholders that included residents’ groups and the local builders association.

Slate will soon submit this project to Toronto’s City Planning department for approval. It has launched a website to collect feedback and provide updates through the planning process. If all goes as expected, the project is scheduled for completion in 2024.

The 522-foot-tall, 51,049-sm tower, dubbed One Delisle (Delisle Street is a cross street), is located at a transit node, as Slate’s vision is to establish this area as a pedestrian-friendly neighborhood. “Because of our holdings, we’re in a unique position to take a holistic city building approach,” said Brandon Donnelly, Slate’s vice president of development, in a prepared statement.

The building will align with the neighborhood’s existing architecture, as well as with storefronts on Yonge Street. Two- and three-story retail buildings are currently on the property where the tower would be built. The plan calls for the historic façade of one of those buildings to be retained, but also pushed back 11.5 feet to create a 23-ft wide sidewalk along Yonge Street. Generous setbacks in general will allow for wider sidewalks and increased sunlight at street level.

Studio Gang has designed the 16-sided, 48-story tower as a series of eight-story elements that spiral up the façade. This design will allow for various-sized floor plates and diverse retail and residential options. Each of the 263 one- to three-bedroom residences in the tower will have its own terrace or balcony. And each element will be topped with planted terraces and protected balconies within them to extend outdoor living.

Ground-floor retail would be the base of a tower whose eight-story hexagonal elements taper at the top. Image: Norm Li, Courtesy of Studio Gang

 

The hexagonal modules that would comprise the building’s façade will provide passive solar heating and cooling. Three-fifths of the building’s façade will be opaque, allowing for better insulation. “The geometry of the façade, and the self-shading it provides, allow each living space to stay cool in summer, while also optimizing winter light,” said Jeanne Gang, Studio Gang’s founder, in a statement.

The AOR on this redevelopment project is Toronto-based WZHM Architects, whose office is located at Yonge and St. Clair. Urban Strategies is providing urban design and planning consultation. Janet Rosenberg & Studio is the landscape architect. Other Building Team members so far include Magnusson Klemenic Associates (SE), ERA Architects (heritage consultants), BA Group (transportation and planning consultants), WSP Global (sustainability consultant), and Theakston Environmental (environmental and wind consultant).

Slate has been active in its efforts to revive the Yonge and St. Clair area of midtown. In 2016 it commissioned an eight-story mural that a British artist known as Phlegm—in collaboration with a local muralist Stephanie Bellefleur—painted onto the side of a 12-story building. Slate also introduced a Gensler-designed ravine bench along Yonge Street in the summer of 2017. Slate in collaboration with Janet Rosenberg & Studio is currently revitalizing and expanding the Delisle-St. Clair Parkette by combining a surface parking lot with existing green space, enlarging the aggregate area by 50%.

The other properties that Slate has acquired in midtown Toronto over the past four years are mostly office towers that it is renovating, says Vakis Boutsalis, a spokesperson for the developer.

Related Stories

Urban Planning | Oct 14, 2016

Architecture firm proposes a ‘Border City’ between the United States and Mexico

The city would be situated around New Mexico, Texas, and Chihuahua.

Urban Planning | Oct 3, 2016

A pedestrian bridge linking two of Nashville’s highest-profile neighborhoods is making progress

The project has stalled since being proposed two years ago by former Mayor Karl Dean.

Urban Planning | Sep 20, 2016

Can redesigning crosswalks make cities safer?

A proposal from Ogrydziak Prillinger Architects redesigns San Francisco’s crosswalks to make them more park-like, changing the way cars and pedestrians interact.

Steel Buildings | Sep 15, 2016

New York’s Hudson Yards to feature 16-story staircase sculpture

The installation is designed by British architect Thomas Heatherwick and will be the centerpiece of the $200 million plaza project

Urban Planning | Sep 12, 2016

An Atlanta business group proposes a ‘floating’ park over a busy highway

The half-mile thoroughfare would connect to surrounding streets and companies.

Sustainability | Sep 7, 2016

New plans call for hundreds of thousands of British homes to be heated by factory machines

An expansion of ‘heat networks’ is viewed as a possible means for Britain to accomplish its goal of slashing carbon emissions by 2050.

High-rise Construction | Sep 7, 2016

Shenzhen Kingkey Group submits re-planning package for what could become China’s tallest tower

The high-rise, H700 Shenzhen Tower, is one of a group of towers being built in Shenzhen’s Caiwuwei financial and commercial area.

Building Team | Sep 6, 2016

Letting your resource take center stage: A guide to thoughtful site selection for interpretive centers

Thoughtful site selection is never about one factor, but rather a confluence of several components that ultimately present trade-offs for the owner.

Urban Planning | Jul 19, 2016

New game challenges players to create a utopian city block

By treating the neighborhood as a living entity, players of Block’hood take part in the creation, death, and rebirth of their own city blocks

Augmented Reality | Jul 15, 2016

Pokémon Go is helping people discover their cities

While catching them all may be the main goal, the wildly popular mobile game is also leading people to trek to unexplored corners of their cities

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021