flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground

Performing Arts Centers

Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground

The venue accommodates open-air productions against backdrop of Hudson River


By Peter Fabris, Contributing Editor | October 10, 2024
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang

A new permanent home for Hudson Valley Shakespeare, a professional non-profit theater company, recently broke ground in Garrison, N.Y. The Samuel H. Scripps Theater Center includes a 14,850 sf performance venue that will serve as a permanent home for the theater company known for its sweeping open-air productions of classics and new works. The theater, located 80 minutes north of Manhattan, is set against the backdrop of the Hudson River and the surrounding landscape of a 98-acre campus.

The structure will be the first public purpose-built LEED Platinum theater in the United States and is the centerpiece of a design with extensive green space and rewilding across the campus, a former golf course. Designed by Studio Gang, the facility will be a singular theatrical destination for New York and the wider performing arts community and a cultural anchor for Hudson Valley, while providing the company with greater versatility for actors, audiences, and back-of-house operations. It will extend the viable performance season into the fall.

The theater’s curved, timber-framed grid shell and timber columns emerge from the landscape to create a dialogue with the Hudson Highlands. The stage’s proscenium arch is oriented to frame picturesque views of the Wey-Gat (Dutch for “Wind Gate”) of Storm King Mountain, the Hudson River, and Breakneck Ridge, and allows actors to use the existing topography to emerge from the landscape. Anchored by an open-air theater, the program is spread across several pavilions that include a back-of-house facility, a concession building, and public restrooms.

Each pavilion is clad in natural materials evoking the minerality of the region. Outdoor gathering spaces adjacent to the theater encourage visitors to connect with each other in an extraordinary natural setting, while a nearby overlook offers an intimate space for pre- and post-performance programming.

The landscape design rehabilitates the former golf course to restore native grasses and wetlands supporting biodiversity and decreased resource use. Nearly 14 acres of new plantings will include 250 native or adaptive trees, native grasses, forbs, and perennials, and bioretention areas that collect and filter stormwater runoff. The landscape is designed as an experiential sequence. Upon arrival to a gravel parking area, visitors encounter a mix of unpaved and accessible paths that guide them up and through native meadows, immersing them in nature and providing views out to the Wind Gate, and ultimately leading to the hilltop theater and gathering areas.

Much of the site was left open for future walking trails or other community uses, while 25,000 sf of picnic lawns, shaded by new native trees, offer an abundance of vantage points to take in the view and enjoy pre-show programming. The design employs several features to enhance environmental performance, including natural ventilation and brise soleil systems, low embodied carbon structure and cladding, and rooftop solar panels.

Project Team
Owner and/or developer: Hudson Valley Shakespeare
Design architect: Studio Gang
Architect of record: Studio Gang
MEP engineer: Buro Happold
Structural engineer: Thornton Tomasetti
General contractor/construction manager: Consigli Construction

Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Site plan courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang

Related Stories

| Jun 12, 2014

Austrian university develops 'inflatable' concrete dome method

Constructing a concrete dome is a costly process, but this may change soon. A team from the Vienna University of Technology has developed a method that allows concrete domes to form with the use of air and steel cables instead of expensive, timber supporting structures.

| Jun 9, 2014

Green Building Initiative launches Green Globes for Sustainable Interiors program

The new program focuses exclusively on the sustainable design and construction of interior spaces in nonresidential buildings and can be pursued by both building owners and individual lessees of commercial spaces.

| May 29, 2014

7 cost-effective ways to make U.S. infrastructure more resilient

Moving critical elements to higher ground and designing for longer lifespans are just some of the ways cities and governments can make infrastructure more resilient to natural disasters and climate change, writes Richard Cavallaro, President of Skanska USA Civil.

| May 20, 2014

Kinetic Architecture: New book explores innovations in active façades

The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.

| May 19, 2014

What can architects learn from nature’s 3.8 billion years of experience?

In a new report, HOK and Biomimicry 3.8 partnered to study how lessons from the temperate broadleaf forest biome, which houses many of the world’s largest population centers, can inform the design of the built environment.

| May 13, 2014

19 industry groups team to promote resilient planning and building materials

The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.

| May 11, 2014

Final call for entries: 2014 Giants 300 survey

BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.

| May 2, 2014

World's largest outdoor chandelier tops reworked streetscape for Cleveland's PlayhouseSquare

Streetscape project includes monumental gateway portals, LED signage, and a new plaza, fire pit, sidewalk café, and alfresco dining area. 

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

| Apr 16, 2014

Upgrading windows: repair, refurbish, or retrofit [AIA course]

Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021