A new permanent home for Hudson Valley Shakespeare, a professional non-profit theater company, recently broke ground in Garrison, N.Y. The Samuel H. Scripps Theater Center includes a 14,850 sf performance venue that will serve as a permanent home for the theater company known for its sweeping open-air productions of classics and new works. The theater, located 80 minutes north of Manhattan, is set against the backdrop of the Hudson River and the surrounding landscape of a 98-acre campus.
The structure will be the first public purpose-built LEED Platinum theater in the United States and is the centerpiece of a design with extensive green space and rewilding across the campus, a former golf course. Designed by Studio Gang, the facility will be a singular theatrical destination for New York and the wider performing arts community and a cultural anchor for Hudson Valley, while providing the company with greater versatility for actors, audiences, and back-of-house operations. It will extend the viable performance season into the fall.
The theater’s curved, timber-framed grid shell and timber columns emerge from the landscape to create a dialogue with the Hudson Highlands. The stage’s proscenium arch is oriented to frame picturesque views of the Wey-Gat (Dutch for “Wind Gate”) of Storm King Mountain, the Hudson River, and Breakneck Ridge, and allows actors to use the existing topography to emerge from the landscape. Anchored by an open-air theater, the program is spread across several pavilions that include a back-of-house facility, a concession building, and public restrooms.
Each pavilion is clad in natural materials evoking the minerality of the region. Outdoor gathering spaces adjacent to the theater encourage visitors to connect with each other in an extraordinary natural setting, while a nearby overlook offers an intimate space for pre- and post-performance programming.
The landscape design rehabilitates the former golf course to restore native grasses and wetlands supporting biodiversity and decreased resource use. Nearly 14 acres of new plantings will include 250 native or adaptive trees, native grasses, forbs, and perennials, and bioretention areas that collect and filter stormwater runoff. The landscape is designed as an experiential sequence. Upon arrival to a gravel parking area, visitors encounter a mix of unpaved and accessible paths that guide them up and through native meadows, immersing them in nature and providing views out to the Wind Gate, and ultimately leading to the hilltop theater and gathering areas.
Much of the site was left open for future walking trails or other community uses, while 25,000 sf of picnic lawns, shaded by new native trees, offer an abundance of vantage points to take in the view and enjoy pre-show programming. The design employs several features to enhance environmental performance, including natural ventilation and brise soleil systems, low embodied carbon structure and cladding, and rooftop solar panels.
Project Team
Owner and/or developer: Hudson Valley Shakespeare
Design architect: Studio Gang
Architect of record: Studio Gang
MEP engineer: Buro Happold
Structural engineer: Thornton Tomasetti
General contractor/construction manager: Consigli Construction
Related Stories
| Aug 11, 2010
Burt Hill, HOK top BD+C's ranking of the nation's 100 largest university design firms
A ranking of the Top 100 University Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms
A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
David Rockwell unveils set for upcoming Oscar show
The Academy of Motion Picture Arts and Sciences and 82nd Academy Awards® production designer David Rockwell unveiled the set for the upcoming Oscar show.
| Aug 11, 2010
Firehouse converted to hip hot property
Sound the alarm! A 9,000-sf former firehouse is being converted into a new multipurpose space for ZUMIX, a nonprofit music and arts organization that's partnering on the project with Landmark Structures of Woburn, Mass., and the East Boston Community Development Corporation. The $2 million renovation of the 1920s structure, known as Engine Company 40 Firehouse, includes a complete gut job to ma...
| Aug 11, 2010
Project is music to school's ears
Florida Gulf Coast University is building a $7.55 million Fine Arts Building on its campus near Ft. Myers, Fla. The 25,000-sf building—the first project in the school's plan for an entire music complex—will house the music program of the College of Arts and Sciences. The facility includes a 200-seat recital hall, rehearsal hall, music labs, studio rooms, and administration offices.
| Aug 11, 2010
Theater offers spectacular views inside and out
A 500-seat proscenium theater sits at the heart of the 35,000-sf Performing Arts Pavilion at the Jackson Hole Center for the Arts. The entertainment and cultural facility, designed by Stephen Dynia Architects, Jackson Hole, Wyo., also houses glass-walled rehearsal rooms that offer passersby views of the activity going on inside and multifunction lobby with views of Snow King Mountain.
| Aug 11, 2010
Broadway-style theater headed to Kentucky
One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.
| Aug 11, 2010
Dallas Center for the Performing Arts opens
The Dallas Center for the Performing Arts, a new multi-venue center for music, opera, theater, and dance, will open this month, completing the 25-year vision of the Dallas Arts District. Foster + Partners, Rem Koolhaas, Joshua Prince-Ramus, and Skidmore Owings & Merrill are among the architecture firms involved in the development, which includes four venues unified by a 10-acre park.
| Aug 11, 2010
Modest recession for education construction
Construction spending for education expanded modestly but steadily through March, while at the same time growth for other institutional construction had stalled earlier in 2009. Education spending is now at or near the peak for this building cycle. The value of education starts is off 9% year-to-date compared to 2008.
| Aug 11, 2010
Opening night close for Kent State performing arts center
The curtain opens on the Tuscarawas Performing Arts Center at Kent State University in early 2010, giving the New Philadelphia, Ohio, school a 1,100-seat multipurpose theater. The team of Legat & Kingscott of Columbus, Ohio, and Schorr Architects of Dublin, Ohio, designed the 50,000-sf facility with a curving metal and glass façade to create a sense of movement and activity.