Suffolk Construction recently joined state and local officials to celebrate the groundbreaking of The Victor, a 12-story, 377,000 sf residential tower consisting of 286 new apartments. Located at 95 Haverhill Street, at the northern end of the Rose F. Kennedy Greenway, the $92 million project will also include 17,000 sf of retail space and a three-story, above-grade parking garage with 138 spaces.
The Victor, which will be constructed over a portion of both an MBTA tunnel and the Thomas P. O’Neill I-93 tunnel, is expected to create 400 construction jobs, as well as additional jobs through its future retail tenants.
Building amenities will include two rooftop lounges, a 3,000 square-foot health club with a sports court and gaming lounge, and a residential lobby and lounge. It will also feature a variety of floor plans for residents, and be built according to LEED Silver standards.
The Victor mark’s Suffolk’s first time working with Simpson Housing LLLP, who will manage the building upon completion. ADD Inc is the architect. Construction is scheduled to be completed in early 2013. BD+C
Related Stories
| Jul 18, 2012
Green expert Kats joins GreenWizard as an advisor
Kats' role is to help further expand GreenWizard’s impact in the sustainable construction industry.
| Jul 18, 2012
Construction employment stagnates in June
Lack of hiring in construction combined with job growth elsewhere threatens to create skilled-labor gap once contractors are ready to hire again.
| Jul 18, 2012
Legat & Kingscott relocates architecture/interior design office
Move enables the architecture/interior design firm to better serve its expanding clientele.
| Jul 18, 2012
Alcoa appoints Hunter Architectural Manager
Hunter to operate with the goal of driving specification, new product adoption and overall demand for the Alcoa BCS North America product range.
| Jul 17, 2012
AIA and Architecture for Humanity select Disaster Response Grant recipients
Awards help each group implement their locally driven preparedness project in the second half of the year.
| Jul 17, 2012
KM/Plaza changes name to Plaza Construction
Lands new projects including the Perry South Beach Hotel and Dadeland Mall Kendall Wing Expansion.
| Jul 17, 2012
Dr. Phillips Charities Headquarters Building receives LEED Silver
The building incorporates sustainable design features, environmentally-friendly building products, energy efficient systems, and environmentally sensitive construction practices.
| Jul 16, 2012
BD+C Under 40 Leadership Summit scheduled
Attendee registration for U40 Summit II now open.
| Jul 16, 2012
Construction spending at 2 ½ year peak
Construction economist Ken Simonson says that four private nonresidential categories each posted 12-month spending increases of more than 25%: power and energy construction, 35%; hotels, 29%; educational and manufacturing, 27% apiece.
| Jul 16, 2012
Chen named design director at Heery
Chen comes to Heery from his own firm, Mark Chen Architect, a design and planning consulting firm, based in New York City, whose recent work includes large-scale planning studies for mixed-use projects.