flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Suffolk Construction to manage Lawrence & Memorial Hospital Cancer Center project in Waterford, Conn.

Suffolk Construction to manage Lawrence & Memorial Hospital Cancer Center project in Waterford, Conn.

Leading construction management firm overseeing one of first healthcare projects in the country to utilize innovative IPD process.


By By BD+C Staff | January 31, 2012
For the Cancer Center project, the IPD method will consist of a contractual arrangement between Lawrence & Memorial Hospital, Su

Suffolk Construction was recently awarded Lawrence & Memorial Hospital’s Cancer Center project in Waterford, Conn. The $34.5 million Cancer Center will feature new construction of a 47,000 square-foot comprehensive facility that will include extensive radiation and medical oncology programs, along with state-of-the-art treatment technologies. The project is notable because it will be one of the first healthcare construction projects in the country to utilize the innovative Integrated Project Delivery (IPD) method.

For the Cancer Center project, the IPD method will consist of a contractual arrangement between Lawrence & Memorial Hospital, Suffolk Construction, and the architecture firm, TRO Jung|Brannen. The contract will require that all risk and reward on the project be shared with all project stakeholders, including mechanical/plumbing/controls, electrical, and sitework contractors. The origin of IPD is aligned with Suffolk’s proactive, collaborative approach to managing construction projects. 

Suffolk will also leverage lean design and construction techniques and Building Information Modeling (BIM) to minimize issues during construction, enhance team-wide collaboration, and add significant overall value on the project. In conjunction with Lawrence & Memorial Hospital, the project team will utilize the Production Preparation Process (3P) lean design approach and pull planning tools to allow for more decision making and knowledge sharing early in the planning process. Pull planning will enable the team to improve the flow of the project schedule, increase efficiency, and reduce waste.

Construction of the Cancer Center—which signifies Suffolk’s first project with Lawrence & Memorial Hospital—will begin in spring 2012. The grand opening is scheduled for September 2013. The Cancer Center project is part of Lawrence& Memorial Hospital’s master facility plan and will feature a sustainable design strategy to achieve LEED Silver certification. BD+C

Related Stories

| May 14, 2012

ArchiCAD e-Specs integration unveiled

Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.

| May 11, 2012

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

Download the complete White Paper, Chapters 1-10

| May 11, 2012

Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings

We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.

| May 11, 2012

Chapter 9 The Key to Commissioning That Works? It Never Stops

Why commissioning for existing and renovated buildings needs to be continuous to be effective.

| May 11, 2012

Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity

What historic preservationists and energy-performance advocates can learn from each other.

| May 11, 2012

VFA to acquire Altus Group's Capital Planning division

Strategic move strengthens VFA's facilities capital planning market osition in North America.

| May 11, 2012

Betz promoted to senior vice president for McCarthy’s San Diego Office

He will oversee client relations, estimating, office operations and personnel as well as integration of the company’s scheduling, safety and contracts departments.

| May 11, 2012

CRSI appoints Brace chairman

Stevens also elected to board of directors and vice-chair.

| May 11, 2012

Dempster named to AIA College of Fellows

Altoon Partners’ technical and construction services leader honored for his contributions.

| May 11, 2012

AIA launches education and training portal

New portal to host Contract Documents training, education resources in one convenient place.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021