flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Suffolk selected for Rosenwald Elementary modernization project

Suffolk selected for Rosenwald Elementary modernization project

The 314-student station elementary school will undergo extensive modernization.


By Posted by Tim Gregorski, Senior Editor | May 15, 2012
The new construction will consist of exceptionally efficient exterior building e
The new construction will consist of exceptionally efficient exterior building envelop and roofing system, as well as mechanical

The School District of Palm Beach (Fla.) County awarded Suffolk Construction the Construction Management at Risk Services for the Rosenwald Elementary School Modernization project.

The anticipated 40,776-sf school, located in the western community of South Bay, Fla., will undergo a complete modernization to the existing 314 student stations. Project scope includes the demolition of multiple buildings dating back as far as 1951 followed by extensive site demucking during the first phase before the new construction can begin.

The new construction will consist of exceptionally efficient exterior building envelop and roofing system, as well as mechanical, electrical, and plumbing systems all meeting the U.S. Green Building Council (USGBC) LEED silver certification requirements. Additionally, at the District’s request, given their long standing support of sustainability efforts, Suffolk is currently providing a complete analysis of the potential cost considerations needed to reach the LEED Platinum level of certification.

In order to streamline and enhance construction of the new buildings, Suffolk in collaboration with the design team, is implementing virtual modeling technologies through Building Information Modeling (BIM) early into the preconstruction effort allowing more predictability of the schedule and adding value to the School District.

The project, designed by Song + Associates, Inc., is expected to be completed during the summer of 2014, well ahead of the approaching school year. +

Related Stories

| May 9, 2014

40 Under 40: Where are they now?

BD+C catches up with two past U40 honorees: Matt Dumich of Adrian Smith + Gordon Gill Architecture and David Montalba of Montalba Architects

| May 8, 2014

Perfecting prefab: 8 tips for healthcare construction projects

Leading AEC firms offer helpful advice for using BIM to pull off prefab for everything from MEP infrastructure to whole bathrooms. 

| May 8, 2014

Don’t bother planning for the future - it doesn’t care about you

Though strategic planning has helped many businesses move forward, its time has passed. So says Economist and Author Bill Conerly. SPONSORED CONTENT

| May 8, 2014

Infographic: 4 most common causes of construction site fatalities

In honor of Safety Week, Skanska put together this nifty infographic on how to prevent deadly harm in construction. 

| May 8, 2014

Sporting events in style: Infographic showcases novel stadiums of the world

UK precast concrete maker Banagher, which specializes in precast stadia solutions, has assembled a list of the world's top stadiums in terms of architectural and structural design.

| May 7, 2014

Design competition: $900,000 on the line in Las Vegas revitalization challenge

Las Vegas Mayor Carolyn Goodman wants your economic development ideas for remaking four areas within the city, including the Cashman Center and the Las Vegas Medical District.

| May 6, 2014

'Beyond' is artist's cinematic take on 2.5 years of development in the UAE

Seven-minute video offers a time-lapse trip through the built environments of Abu Dhabi and Dubai.

| May 6, 2014

'Ugliest building in New Jersey' finally getting facelift

After a decade of false starts and mishaps, the American Dream mall in the Meadowlands may finally get built.

| May 5, 2014

Toronto residential tower to feature drawer-like facade scheme

Some of the apartments in the new River City development will protrude from the building at different lengths, creating a drawer-like "push-pull" effect.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021