The School District of Palm Beach (Fla.) County awarded Suffolk Construction the Construction Management at Risk Services for the Rosenwald Elementary School Modernization project.
The anticipated 40,776-sf school, located in the western community of South Bay, Fla., will undergo a complete modernization to the existing 314 student stations. Project scope includes the demolition of multiple buildings dating back as far as 1951 followed by extensive site demucking during the first phase before the new construction can begin.
The new construction will consist of exceptionally efficient exterior building envelop and roofing system, as well as mechanical, electrical, and plumbing systems all meeting the U.S. Green Building Council (USGBC) LEED silver certification requirements. Additionally, at the District’s request, given their long standing support of sustainability efforts, Suffolk is currently providing a complete analysis of the potential cost considerations needed to reach the LEED Platinum level of certification.
In order to streamline and enhance construction of the new buildings, Suffolk in collaboration with the design team, is implementing virtual modeling technologies through Building Information Modeling (BIM) early into the preconstruction effort allowing more predictability of the schedule and adding value to the School District.
The project, designed by Song + Associates, Inc., is expected to be completed during the summer of 2014, well ahead of the approaching school year. +
Related Stories
| Apr 25, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Biologics Support Center
Project receives LEED Gold Certification.
| Apr 25, 2012
McCarthy introduces high school students to a career in construction
High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.
| Apr 25, 2012
Missner Group names McCrory VP of property management
McCrory will be responsible for overseeing the financial and operational needs of the firm’s commercial real estate portfolio which includes more than two million square feet of property.
| Apr 25, 2012
Rogers joins Morgan/Harbour as senior project manager
Rogers will also manage the construction process and daily activities as well as act as the interface between the subcontractors, owners, municipalities and regulatory agencies
| Apr 25, 2012
J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University
The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.
| Apr 24, 2012
ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014
Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.
| Apr 24, 2012
Roofing Supply Group acquired by Clayton, Dubilier & Rice
RSG provides a complete offering of residential and commercial roofing materials and related supplies.
| Apr 24, 2012
McLennan named Ashoka Fellow
McLennan was recognized for his work on the Living Building Challenge.
| Apr 24, 2012
AECOM design and engineering team realizes NASA vision for Sustainability Base
LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.