The School District of Palm Beach (Fla.) County awarded Suffolk Construction the Construction Management at Risk Services for the Rosenwald Elementary School Modernization project.
The anticipated 40,776-sf school, located in the western community of South Bay, Fla., will undergo a complete modernization to the existing 314 student stations. Project scope includes the demolition of multiple buildings dating back as far as 1951 followed by extensive site demucking during the first phase before the new construction can begin.
The new construction will consist of exceptionally efficient exterior building envelop and roofing system, as well as mechanical, electrical, and plumbing systems all meeting the U.S. Green Building Council (USGBC) LEED silver certification requirements. Additionally, at the District’s request, given their long standing support of sustainability efforts, Suffolk is currently providing a complete analysis of the potential cost considerations needed to reach the LEED Platinum level of certification.
In order to streamline and enhance construction of the new buildings, Suffolk in collaboration with the design team, is implementing virtual modeling technologies through Building Information Modeling (BIM) early into the preconstruction effort allowing more predictability of the schedule and adding value to the School District.
The project, designed by Song + Associates, Inc., is expected to be completed during the summer of 2014, well ahead of the approaching school year. +
Related Stories
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 6, 2012
Perkins Eastman unveils Qatar mixed-use sports complex
Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.
| Apr 5, 2012
5 tips for a successful door and window retrofit
An exclusive tip sheet to help the Building Team manage door and window retrofits successfully.
| Apr 4, 2012
Educational facilities see long-term benefits of fiber cement cladding
Illumination panels made for a trouble-free, quick installation at a cost-effective price.
| Apr 4, 2012
HDS designs Mount Auburn Hospital’s new healthcare center in Waltham, Mass.
HDS Architecture provided design services for all the Mount Auburn Healthcare suites including coordination of HVAC and FP engineering.
| Apr 4, 2012
Bald joins the Harmon glazing team
Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he was the regional manager of the Mid-Atlantic region.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 4, 2012
San Antonio animal hospital earns LEED Platinum certification
Middleman Construction Company builds the city?s first commercial building to earn certification.
| Apr 4, 2012
Hason joins RNL’s as MENA regional director
Hason specializes in planning and urban design, hospitality, office, corporate headquarters and transportation structures, as well as, higher education and museum facilities.
| Apr 3, 2012
Product Solutions
Two new PV systems; a lighter shelf; and fire alarm/emergency communication system.