The School District of Palm Beach (Fla.) County awarded Suffolk Construction the Construction Management at Risk Services for the Rosenwald Elementary School Modernization project.
The anticipated 40,776-sf school, located in the western community of South Bay, Fla., will undergo a complete modernization to the existing 314 student stations. Project scope includes the demolition of multiple buildings dating back as far as 1951 followed by extensive site demucking during the first phase before the new construction can begin.
The new construction will consist of exceptionally efficient exterior building envelop and roofing system, as well as mechanical, electrical, and plumbing systems all meeting the U.S. Green Building Council (USGBC) LEED silver certification requirements. Additionally, at the District’s request, given their long standing support of sustainability efforts, Suffolk is currently providing a complete analysis of the potential cost considerations needed to reach the LEED Platinum level of certification.
In order to streamline and enhance construction of the new buildings, Suffolk in collaboration with the design team, is implementing virtual modeling technologies through Building Information Modeling (BIM) early into the preconstruction effort allowing more predictability of the schedule and adding value to the School District.
The project, designed by Song + Associates, Inc., is expected to be completed during the summer of 2014, well ahead of the approaching school year. +
Related Stories
| Nov 29, 2011
Turner Construction establishes partnership with Clark Builders
Partnership advances growth in the Canadian marketplace.
| Nov 29, 2011
AIA launches stalled projects database
To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.
| Nov 28, 2011
Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.
Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.
| Nov 28, 2011
Armstrong acquires Simplex Ceilings
Simplex will become part of the Armstrong Building Products division.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 23, 2011
Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas
Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 22, 2011
Corporate America adopting revolutionary technology
The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector.
| Nov 22, 2011
Report finds that L.A. lags on solar energy, offers policy solutions
Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.