flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Dec 15, 2016

OSHA releases safety recommendation guide for construction industry

It is said to be most helpful to small and mid-sized contractors.

Codes and Standards | Dec 14, 2016

Cities must invest $375 billion to avoid catastrophic global climate change

C40 Cities Climate Leadership Group advocates low carbon infrastructure.

Codes and Standards | Dec 14, 2016

Resilient construction techniques pay for themselves over lifetime of buildings

Spending $340,000 for resiliency would pay for itself over the lifetime of a $10 million structure.

Codes and Standards | Dec 12, 2016

Dept. of Energy launches program to advance zero energy school design

Six school districts and two states are among the first to mainstream zero energy schools.

Codes and Standards | Dec 9, 2016

California city’s plan for net zero building includes net zero water usage

Santa Monica city services building aims for highest level of sustainability.

Codes and Standards | Dec 8, 2016

WELL and BREEAM to align standards

The goal is to make it easier for projects pursuing both standards.

Codes and Standards | Dec 7, 2016

U.S. lumber industry pushes for import duties on Canadian softwood

The industry claims the product is being sold below fair market value.

Codes and Standards | Dec 5, 2016

International Construction Measurement Standards draft released

The goal is to improve consistency for calculating costs and reducing risk.

Codes and Standards | Dec 2, 2016

D.C. Council passes bill to reduce number of blighted properties

The new legislation reduces the amount of time a vacant property can qualify for a lower tax rate.

Codes and Standards | Dec 1, 2016

Passive House standard gaining influence in commercial sector

Some industry watchers predict it will become the base building code. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021