flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | May 9, 2016

EcoDistricts unveils sustainable neighborhood framework

Focus is on equity, resilience, and climate protection.  

School Construction | May 3, 2016

Florida clamps down on school construction spending

Critics fear rules will hamper ability to build schools with desired features.  

Resiliency | May 2, 2016

Connecticut to develop new code standards for resiliency

Expected more frequent severe weather events due to climate change prompts review.  

Contractors | Apr 29, 2016

OSHA issues advisory to protect workers from Zika virus

Construction industry workers considered at high risk.  

Codes and Standards | Apr 28, 2016

New research finds 30 measures to significantly cut energy use

ASHRAE’s prescription cuts across all building types and climates.  

Codes and Standards | Apr 27, 2016

Florida gives developers more time to install first responder radio signal systems

Expensive upgrades can be postponed for several years.  

Codes and Standards | Apr 25, 2016

San Francisco becomes first big U.S. city to require solar panels on new buildings

Pertains to commercial and residential buildings shorter than 10 stories.  

Codes and Standards | Apr 25, 2016

GSA adopts SITES land development and management rating system

Federal agency will use for properties with and without buildings.  

Wood | Apr 22, 2016

Revised 2015 Manual for Engineered Wood Construction available

American Wood Council Document offers design information for structural applications.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021