flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Swimming may be returning to Melbourne’s polluted Yarra River… kind of

Sports and Recreational Facilities

Swimming may be returning to Melbourne’s polluted Yarra River… kind of

The addition of a pool to the Yarra may help improve people’s perception of the river and act as the impetus to an increase in support for improving its water quality.


By David Malone, Associate Editor | June 9, 2016

Rendering courtesy Studio Octopi

Rivers are often times the more utilitarian of the different types of bodies of water. Oceans and lakes are thought of as fun places to partake in water sports, go for a swim, or just relax on their sandy beaches, and ponds are seen as serene and relaxing spots to go fishing or to sit back and enjoy the wildlife. Meanwhile, rivers are often viewed as the highways of the water world; they are connectors and pathways to something bigger and better. Boats and barges travel up and down them as they make their way to or from an ocean or lake leading to heavy traffic and plenty of pollution. 

Sure, maybe we walk along riverwalks or enjoy lunch on an outdoor patio where the rushing water can be heard, but, thanks to the heavy water traffic and pollution, rivers are often only enjoyed as ambiance, not as a place to actually take a dip and cool down on a hot summer day.

Some cities, however, are trying to return these heavily polluted and trafficked rivers back into swimmable destinations for the enjoyment of locals and visitors alike. New York has a proposed floating pool for one of its rivers and river pools already exist in cities like Zurich, Berlin, and Paris, and now, the Yarra River in Melbourne, Australia is looking to join this list.

According to inhabitat.com, the non-profit organization Yarra Swim Co. is looking to make the heavily polluted Yarra River swimmable once more. One of the first major steps they are taking to achieve this goal is to work with Arup to develop a Yarra River pool. While, technically, swimming in the pool wouldn’t be the same thing as swimming in the Yarra, it would be the first step in bringing swimming back to the waterway. 

The plans call for a self-contained pool that floats in the Yarra River, however, Arup and Yarra Swim Co. are looking into ways to filter and clean the surrounding water so that it can be used to supply the water in the pool, which is kind of like swimming in the river itself, right? Currently, Arup says there is a patent pending for this type of technology.

Yarra Swim Co. hopes the pool will help to change public opinion about the polluted waterway and be the push needed to rally people around the idea of cleaning the river for good. Ultimately, Yarra Swim Co. hopes the river can be cleaned thoroughly enough so the race to Prince's Bridge, which was once one of the largest swimming competitions in the world, can once again be held.

Funds to build the pool, which, in Australian dollars would cost around $6 and $8 million, may be raised through a combination of crowdfunding, sponsorships, and grants. If all goes according to plan, the pool could be open to the public by 2019 or 2020.

So while people may not be swimming in the Yarra anytime in the near future (at least, not without imbibing in a few rounds of liquid courage first), the pool, especially if the patent pending technology works, could be the first step in the overall process of making the Yarra River swimmable once again.

 

Photo Credit: Daderot, Wikimedia Commons

Related Stories

Sports and Recreational Facilities | Jan 29, 2016

Billion-dollar dome in Las Vegas could be the Oakland Raiders next home

The franchise, which is considering relocation if it can’t work out a stadium deal in the Bay Area, is listening to a new stadium pitch from investors in Las Vegas, led by the Sands Corp.  

Giants 400 | Jan 29, 2016

SPORTS FACILITIES GIANTS: Populous, AECOM, Turner among top sports sector AEC firms

BD+C's rankings of the nation's largest sports sector design and construction firms, as reported in the 2015 Giants 300 Report 

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Sports and Recreational Facilities | Jan 13, 2016

Multi-billion-dollar stadium planned as the NFL returns to Los Angeles

The Rams, formerly of St. Louis, will move into a new stadium possibly by 2019—and they might have a co-tenant.

Sports and Recreational Facilities | Jan 8, 2016

Washington Redskins hire Bjarke Ingels Group to design new stadium

The Danish firm is short on designing football stadiums, but it has led other impressive large scale projects.

Sports and Recreational Facilities | Jan 6, 2016

A solar canopy makes Miami’s arena more functional

NRG Energy teams with Miami Heat to transform an underused open-air plaza and reinforce the facility’s green reputation

Sports and Recreational Facilities | Dec 23, 2015

Kengo Kuma selected to design National Stadium for 2020 Tokyo Olympics

Japan chose between projects from Japanese architects Kuma and Toyo Ito. The decision has been met with claims of favoritism, particularly by the stadium’s original designer, Zaha Hadid.

Sports and Recreational Facilities | Dec 16, 2015

Tokyo down to two finalists for Olympic Stadium design

Both cost less than the Zaha Hadid proposal that was scrapped over the summer.  

Sponsored | Sports and Recreational Facilities | Dec 14, 2015

Soccer Field in the Sky

House of Sports in Ardsley, N.Y., is home to a soccer field on the third floor of a downtown building.  

Sports and Recreational Facilities | Dec 7, 2015

Michigan YMCA receives Universal Design Certification

The 116,200-sf Mary Free Bed YMCA in Grand Rapids is accessable for everyone who uses the facilities.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021