flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

System for installing grease duct enclosures achieves UL listing

System for installing grease duct enclosures achieves UL listing


By By BD+C Staff | October 19, 2011
The system is for use in commercial construction and is expected to be widely used by mechanical HVAC contractors, insulation, m

 

Morgan Thermal Ceramics worked closely with UL (Underwriter’s Laboratories Inc.) to certify a new installation method for grease duct enclosures used in commercial construction.

The new system, an update to the existing classification, results in a 33% space saving. To obtain UL listing for the modified installation method, Morgan Thermal Ceramics conducted extensive fire performance testing in accordance with ASTM E 2336.

The improved installation method is part of a complete system that includes all materials and the way the materials are installed. The wrapping system uses Morgan Thermal Ceramics’ FireMaster FastWrap XL products, which are installed using compression joints at all seams on both layers of a 2-layer grease duct system.

Also included is the new FireMaster FastDoor XL UL-listed access door for grease ducts, which provides a safe and easy way to gain access to kitchen ducts for cleaning and inspection.

The system is for use in commercial construction and is expected to be widely used by mechanical HVAC contractors, insulation, mechanical, and general contractors, as well as duct designers and architects. BD+C

Related Stories

| Jul 22, 2013

Top University Sector Architecture Firms [2013 Giants 300 Report]

Cannon, Perkins+Will, Stantec top Building Design+Construction's 2013 ranking of the largest university sector architecture and architecture/engineering firms in the U.S.

| Jul 22, 2013

Top Office Sector Construction Firms [2013 Giants 300 Report]

Turner, Structure Tone, PCL top Building Design+Construction's 2013 ranking of the largest office sector contractors and construction management firms in the U.S.

| Jul 22, 2013

Top Office Sector Engineering Firms [2013 Giants 300 Report]

AECOM, Parsons Brinckerhoff, Jacobs top Building Design+Construction's 2013 ranking of the largest office sector engineering and engineering/architecture firms in the U.S.

| Jul 22, 2013

Top Office Sector Architecture Firms [2013 Giants 300 Report]

Gensler, HOK, Perkins+Will top Building Design+Construction's 2013 ranking of the largest office sector architecture and architecture/engineering firms in the U.S.

| Jul 22, 2013

Market gains encourage better workplace design [2013 Giants 300 Report]

The commercial office sector is finally heating up, led by corporate headquarter and medical office building projects.

| Jul 22, 2013

Top Hotel Construction Firms [2013 Giants 300 Report]

Manhattan Construction, Structure Tone, Lend Lease top Building Design+Construction's 2013 ranking of the largest hotel contractors and construction management firms in the U.S.

| Jul 22, 2013

Top Hotel Architecture Firms [2013 Giants 300 Report]

Gensler, WATG, HKS top Building Design+Construction's 2013 ranking of the largest hotel architecture and architecture/engineering firms in the U.S.

| Jul 22, 2013

Hotel business continues to shine [2013 Giants 300 Report]

Despite some economic stressors, hotel operating fundamentals are poised to remain strong in 2013.

| Jul 22, 2013

Transportation Facility Report [2013 Giants 300 Report]

Building Design+Construction's rankings of design and construction firms with the most revenue from airport terminals and other transportation-related facilities, as reported in the 2013 Giants 300 Report.

| Jul 22, 2013

Convention Center Report [2013 Giants 300 Report]

Building Design+Construction's rankings of design and construction firms with the most revenue from convention center projects, as reported in the 2013 Giants 300 Report.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021