flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Tampa Museum of Art will soon undergo a $110 million expansion

Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

Designed by Weiss/Manfredi, and with construction manager The Beck Group, the project will redefine the museum’s surrounding site and enhance the visitor experience.


By Novid Parsi, Contributing Editor | August 19, 2024
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. 

Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site. It will create new riverfront public terraces, sculpture parks, redesigned entrance plazas, outdoor dining, and improved dog parks.

Continuing Tampa’s Riverwalk, a sloped walk will direct pedestrians from the museum’s ground-floor level to the river, creating a seamless public experience around the museum and park. The ground-floor terrace will feature new native planting and shade trees. Adjacent to the Museum’s indoor auditorium, an outdoor amphitheater will offer a shaded gathering space.

The project will enhance the visitor experience with a new grand lobby. With an 18-foot ceiling, the new first-floor area will provide exhibition space within view of a new full-service restaurant with indoor and outdoor dining. Almost 12,000 sf will be dedicated to a newly covered entrance, lobby, store, and restaurant.

The 150-seat auditorium will overlook the Hillsborough River. With a green room, sprung floor, projectors, AV system, and theatrical lighting, the auditorium can accommodate a range of events, including lectures, recitals, film screenings, and multimedia performances. Lined with acoustic wood panels, the space will be acoustically isolated from the event space above.

Museum to feature flexible event space

With a 30-foot ceiling equipped with a flexible AV and lighting system, the large event space can host various exhibition and event configurations. It can shift from a flexible digital gallery space to a private event space.

The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art

On the fourth-floor rooftop, the interior space will house a flexible bar and accommodate a 100-person gathering. The interior rooftop area also will have a demonstration/test kitchen for culinary arts classes. 

“Tampa Bay is growing by leaps and bounds, and we want the museum’s offerings to keep pace with the demands of our region well into the future,” Jamie Winderbaum Fernandez, board chair of the Tampa Museum of Art, said in a statement.

The expansion project follows the museum’s Centennial Renovation, completed last year. That project increased gallery and education space.

On the Building Team:
Owner: Tampa Museum of Art
Owner’s representative: Ellison Advisors, LLC
Design architect and architect of record: Weiss/Manfredi
MEP/FP engineer: TLC Engineering
Structural engineer: MKA
Construction manager: The Beck Group

The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art

Here is the full press release from The Beck Group:
The Tampa Museum of Art announced today they have selected The Beck Group to manage the construction of the Museum’s Centennial Expansion project. 

An architecture and construction firm with offices in the U.S. and Mexico, Beck has managed the construction of many prominent cultural institutions. These include the Nasher Museum of Art at Duke University, the Nasher Sculpture Center in Dallas, and the Salvador Dali Museum in St. Petersburg. Beck has been in Tampa for more than 30 years. Its deep portfolio includes The James Museum and multiple projects at the Universities of Tampa and South Florida.

The Museum is funding the ambitious 77,904-square-foot expansion project through its ongoing Centennial Campaign, a comprehensive construction and endowment effort anchored by a $25 million lead gift from Dick Corbett. The Museum intends to reach its $110 million fundraising goal by late 2024 or early 2025, after which the institution will break ground. To date, generous support has been provided by individuals, families and corporations, as well as the City of Tampa, Hillsborough County, and the State of Florida.

“Our commitment to the Tampa Bay area extends beyond construction; it's about enriching communities. We take pride in shaping Tampa's downtown waterfront, exemplified by our collaboration on the Tampa Museum of Art’s Centennial Expansion,” said Ryan Toth, regional director for Beck’s Florida office.

“Tampa Bay is growing by leaps and bounds, and we want the Museum’s offerings to keep pace with the demands of our region well into the future,” said Dr. Jamie Winderbaum Fernandez, board chair of the Tampa Museum of Art. “It is a privilege to lead the Tampa Museum of Art board through this transformational project so our neighbors and visitors have access to a world-class cultural landmark.”

The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art

“After completing the Centennial Renovation last year, we are making full use of the increased gallery and education space for the benefit of our visitors, students, and the wider community,” said Michael Tomor, Ph.D., the Jeff and Penny Vinik Executive Director at the Tampa Museum of Art. “The Expansion project we are embarking upon will allow us to offer amenities that will drive sustainability for the Museum and ensure a lasting cultural legacy.”

The Tampa Museum of Art announced in November 2021 that the New York-based design team of WEISS/MANFREDI Architecture/Landscape/Urbanism would design the expansion. C. Samuel Ellison of Ellison Advisors, LLC will be the owner’s representative during the construction of the Museum’s expansion project.

Site Redevelopment
During the expansion project, the Museum’s surrounding site will be redefined to create new riverfront public terraces, sculpture parks, redesigned entrance plazas, outdoor dining and improved dog parks. As a continuation of Tampa’s Riverwalk, a sloped walk will bring pedestrians down to the river edge from the ground floor level. An outdoor amphitheater adjacent to the Museum’s indoor auditorium will serve as a shaded gathering place. With new native planting and shade trees, the Museum’s ground floor terrace will be accessible from the Riverwalk, creating a seamless and integrated public experience around the Museum and the park.

Grand Lobby
The new lobby will be accessible from both Curtis Hixon Park and Gasparilla Plaza. It will enhance the visitor experience with almost 12,000 square feet dedicated to a newly covered entrance, lobby, store, and restaurant. With an 18-foot ceiling height, this new first-floor space will provide ample space for exhibiting art within view of a new full-service restaurant with indoor and outdoor dining.

The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art

Auditorium
With exterior glazing along its West façade, the 150-seat auditorium will overlook the Hillsborough River, providing an inside-outside visual connection that defines the space. Equipped with a green room, sprung floor, projectors, AV system, and theatrical lighting, a range of events can be accommodated here: lectures, recitals, film screenings and multimedia performances. The space will be lined with acoustic wood panels and acoustically isolated from the event space above. A pre-function foyer space will serve as a flexible space on the mezzanine level before and after events.

Flexible Event Space and Digital Exhibition Wall
The large event space features a panoramic view of downtown Tampa, the University of Tampa, the Hillsborough River, and the Straz Center. With a 30-foot-tall ceiling equipped with a flexible AV and lighting system, it can host a myriad of exhibition and event configurations, transforming from a flexible digital gallery space to a private event space that can accommodate a seated dinner for 500 people and a dance floor. The adjacent catering kitchen will service the space when used for private events.

Sculpture Terrace
The new sculpture terrace will connect the existing Sullivan Terrace and the expansion’s second floor. The design will allow sculptures on display to be visible day and night from the Riverwalk and provide a connecting bridge to the new exhibition and event spaces.

Rooftop Spaces
On the fourth-floor rooftop, the interior space will house a flexible bar and accommodate a 100-person gathering, while the adjacent sculpture terrace provides a canopy with a circular oculus for various programming. A demonstration/test kitchen will be incorporated into the interior rooftop space where the Museum will add culinary arts classes to its educational programs.

Sustainability
The new building footprint significantly increases the Museum’s ability to go beyond its strategic plan of offering more exhibition and education programming to the community. All the new additional programable spaces add many more opportunities for income-generation activities into the institution’s business model through an increase in services and retail offerings to additional yearly visitors. With the new business model for the reconfigured space, the Museum will meet, and in some cases exceed, national averages of support and revenue, establishing Tampa’s cultural legacy for generations to come.

The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art
The Tampa Museum of Art will soon undergo a $110 million expansion Rendering courtesy Tampa Museum of Art
Rendering courtesy Tampa Museum of Art

 

Related Stories

Museums | May 28, 2015

SANAA wins bid to design new building for Art Gallery of New South Wales

The museum's developers hope the new gallery will enrich Sydney’s eastern cultural precinct.

Museums | May 18, 2015

Diller Scofidio + Renfro unveils preliminary design for U.S. Olympic Museum

According to the firm’s founding partner, Elizabeth Diller, the design was inspired by the movement of athletes, as it “spirals up and outwards from a central atrium.”

Museums | May 13, 2015

The museum of tomorrow: 8 things to know about cultural institutions in today’s society

Entertainment-based experiences, personal journeys, and community engagement are among the key themes that cultural institutions must embrace to stay relevant, write Gensler's Diana Lee and Richard Jacob.

Museums | Apr 27, 2015

Finalists’ designs for Guggenheim Helsinki competition released

A custom-developed App engages an international public in the selection process.

Museums | Apr 23, 2015

Moshe Safdie unveils pentagonal scheme for National Medal of Honor Museum

The new museum near Charleston, S.C., will archive the history of the nation's highest military honorees.

Museums | Apr 22, 2015

Check out Ralph Johnson's stunning nature-inspired Shanghai museum

The newly opened Shanghai Natural History Museum, designed by Perkins+Will’s Global Design Director Ralph Johnson, mimics the shape of a nautilus shell, and features natural elements throughout. 

Museums | Apr 16, 2015

SANAA and Snøhetta tie at first place for Budapest museum bid

The two firms submitted designs for the New National Gallery and Ludwig Museum, one of five planned museums to be constructed in a park just outside the urban center of Hungary’s capital. 

Sponsored | Fire-Rated Products | Apr 14, 2015

Fire resistive curtain wall brings maximum light, views and safety to Aspen Art Museum

The curtain wall used for the Shigeru Ban-designed museum provides maximum daylight while protecting the art from fire

Museums | Apr 10, 2015

Henning Larsen Architects designs timber museum extension in Sweden

The new extension will complement Österund’s wooded surroundings

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

boombox1
boombox2
native1

More In Category

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.




Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021