flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

TD Bank Group's renovated Toronto office is first WELL-Certified project under WELL v1

Green

TD Bank Group's renovated Toronto office is first WELL-Certified project under WELL v1

The newly renovated 25,000-sf space achieved gold-level status.


By Peter Fabris, Contributing Editor | June 8, 2016
TD Bank Group's renovated Toronto office is first WELL-Certified project under WELL v1

TD Bank Tower and TD North Tower. Photo: John Vetterli/Wikimedia Commons

A TD Bank Group office in downtown Toronto is the first project to be WELL-Certified under WELL v1, the International WELL Building Institute recently announced.

The newly renovated 25,000-sf space achieved gold-level status. The project earned the distinction based on seven categories of building performance—air, water, light, nourishment, fitness, comfort, and mind.

“People are our most important asset,” said Martha MacInnis, design director, Enterprise Real Estate, TD Bank Group. “We’re committed to being an extraordinary place to work, so it made perfect sense to look at our existing design standards and figure out a way to elevate them to the next level.”

The WELL Building Standard is a performance-based certification system using best practices in design and construction along with evidence-based medical and scientific research. To date, WELL has enrolled 154 building projects in 17 countries.

Related Stories

| Feb 15, 2012

Code allowance offers retailers and commercial building owners increased energy savings and reduced construction costs

Specifying air curtains as energy-saving, cost-cutting alternatives to vestibules in 3,000-square-foot buildings and larger has been a recent trend among consulting engineers and architects.

| Feb 8, 2012

World’s tallest solar PV-installation

The solar array is at the elevation of 737 feet, making the building the tallest in the world with a solar PV-installation on its roof.

| Jan 31, 2012

Chapman Construction/Design: ‘Sustainability is part of everything we do’

Chapman Construction/Design builds a working culture around sustainability—for its clients, and for its employees.

| Jan 19, 2012

LEED puts the 'Gold' in Riverside golden arches

McDonald's restaurant recognized for significant energy savings.

| Jan 15, 2012

Hollister Construction Services oversees interior office fit-out for Harding Loevner

The work includes constructing open space areas, new conference, trading and training rooms, along with multiple kitchenettes. 

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Jan 9, 2012

Thornton Tomasetti acquires green consulting firm Fore Solutions

International engineering firm launches new building sustainability practice.

| Jan 6, 2012

Summit Design+Build completes Park Place in Illinois

Summit was responsible for the complete gut and renovation of the former auto repair shop which required the partial demolition of the existing building, while maintaining the integrity of the original 100 year-old structure, and significant re-grading and landscaping of the site.

| Jan 4, 2012

Shawmut Design & Construction awarded dorm renovations at Brown University

Construction is scheduled to begin in June 2012, and will be completed by December 2012.

| Dec 12, 2011

Skanska to expand and renovate hospital in Georgia for $103 Million

The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.

boombox1
boombox2
native1

More In Category

Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021