flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Technical brief addresses the impact of construction-generated moisture on commercial roofing systems

Codes and Standards

Technical brief addresses the impact of construction-generated moisture on commercial roofing systems

The free download offers suggestions for remediation actions.


By Peter Fabris, Contributing Editor | March 15, 2024
Photo by Nicholas Ismael Martinez on Unsplash

Photo by Nicholas Ismael Martinez on Unsplash

A new technical brief from SPRI, the trade association representing the manufacturers of single-ply roofing systems and related component materials, addresses construction-generated moisture and its impact on commercial roofing systems.

Construction-generated moisture comes from activities including pouring concrete, burning propane heaters, painting, plastering, and drywall finishing. These activities can contribute to excessive levels of relative humidity inside the structure when proper remediation measures are not taken. Accumulation of condensation within the roofing assembly and within the structure can result when the temperature is at or below the dew point.

To control moisture, designers must identify the sources of moisture and develop a remediation plan during the design process. To reduce the probability of condensation, buildings under construction must be adequately ventilated, particularly during concrete hydration and other high moisture-related construction activities.

SPRI recommendations include avoiding the use of wet materials or materials with excessive moisture, installing vapor retarders in the roof assembly, avoiding penetrating vapor barriers, installing at least two layers of insulation, and always sealing deck-to-wall joints and gaps around roof penetrations.

Related Stories

| Mar 5, 2014

Quebec's building code doesn't meet needs of its aging population

The issue was raised in the wake of a tragic fire at a seniors' residence in L'Isle-Verte. 

| Mar 4, 2014

Massachusetts Congressional delegation asks FEMA to slow flood zone map requirements

After a recent successful challenge of the scientific methodology used to redraw the coastal high-hazard zones, the Massachusetts congressional delegation is asking federal officials to put the brakes on new flood zone maps for the Bay State.

| Mar 3, 2014

Injury-liability law responsible for higher construction insurance cost in New York

Construction contractors and developers in New York state face $3 billion more in costs and 667 more accidents per year because of a state law that holds builders solely liable for such accidents, according to a study commissioned by the New York Civil Justice Institute.

| Feb 28, 2014

GBI issues guide to help federal agencies meet sustainability mandates

The Green Building Initiative has released “The Guiding Principles Compliance for New Construction,” for federal buildings to help federal agencies meet sustainability mandates in the construction of new buildings.

| Feb 28, 2014

Steel Joist Institute standards open for review

The 2015 draft of the Steel Joist Institute’s “Single Joist Standard Specification for K-, LH-, and DLH-Series and Joist Girders” will be available for public review until May 31, 2014.

| Feb 28, 2014

Metcalf Construction wins key reversal from federal appeals court in Hawaii on military contract

Metcalf spent more than $76 million on a military construction project and sued to recoup costs.

| Feb 19, 2014

Obama Administration moves to boost fuel efficiency standards on heavy-duty vehicles

The Obama Administration wants to boost fuel efficiency of medium- and heavy-duty trucks for models made in 2019 and later.

| Feb 19, 2014

Net Positive Energy + Water is latest green certification standard

The advancement of sustainable construction has reached a new milestone with the development of Net Positive Energy+Water, a new green building certification standard that aims to improve net zero approaches to energy and water conservation.

| Feb 19, 2014

Obama’s climate resilience panel says PVs, cool roofs should be part of solution

Among the suggestions were rooftop solar energy systems and cool roofs, which could be encouraged by policies from local governments.

| Feb 19, 2014

OSHA proposes three-year postponement of crane operator certification requirement

OSHA’s proposal to postpone the compliance date for crane operator certification by three years was made official on Feb. 7 when it was published in the Federal Register.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021