Canada’s Parliamentary complex, in Ottawa, is undergoing a massive 10-year restoration that includes the Centre Block, which houses the government’s two parliamentary chambers. A project team led by Diamond Schmitt Architects and KWC Architects has converted the city’s 1912 train station into a stately interim home for one of those chambers, the Senate.
The building is a prominent component of the Confederation Square Historic site and is located within the Rideau Canal World Heritage Site’s buffer zone. The train station closed in 1968 but the building was repurposed as the Government Conference Centre.
Numerous ad hoc renovations that marred the Beaux Arts classicism of the original were made, as well as seismic and life safety improvements and restoration work to reestablish its character-defining elements.
The renovated Senate Chamber.
The design introduced a contemporary language of interventions and insertions within the monumental and finely detailed General Waiting Room and Concourse.
The chief technical problem involved the rehabilitation of two magnificent suspended plaster ceilings. Several precast coffered panels were tested to determine their strength and typical failure mechanisms. No North American precedent existed, so the team tried a conservation strategy from the United Kingdom to determine its suitability for this ceiling type. The system now serves as a new precedent for plaster conservation in Canada.
Other heritage features, such as Diocletian windows, original door frames, trim, and wainscoting, were salvaged, repaired, and refinished. The gross area was increased to 192,000 sf, from 135,000 sf.
Ninety percent of construction costs went toward making the building reusable as office and conference space once the Centre Block restoration is completed.
General contractor PCL diverted 93% of construction waste from landfill. Building envelope upgrades saved 162,000 kg of carbon emissions. The project earned Green Globes 4 certification.
SILVER AWARD WINNER
BUILDING TEAM Diamond Schmitt Architects and KWC Architects (submitting firms, architects in joint venture) Public Services and Procurement Canada (owner) ERA Architects (conservation architect) John G. Cooke & Associates (SE) Crossey Engineering (M/E engineer) PCL (CM) DETAILS 130,000 sf Total cost $219 million Construction time March 2014 to January 2019 Delivery method CM fast-track
Related Stories
Reconstruction Awards | Nov 26, 2019
Sweetest sounds: Metropolitan Opera House
An early 20th-century opera house now hosts concerts from Disney Acapella to Weezer.
Reconstruction Awards | Nov 25, 2019
The University of Chicago Harris School at the Keller Center
Project team goes all out for LEED Platinum and the Living Building Challenge.
Reconstruction Awards | Nov 22, 2019
Let there be light: Union Station Great Hall
What’s the cure for a leaky skylight? Another skylight built above it, of course.
Reconstruction Awards | Nov 19, 2019
Springfield Technical Community College: Goodbye to 'the shuffle'
College unites student services under one roof.
Reconstruction Awards | Nov 18, 2019
The Paint Factory: Not just a new coat of paint
An enlightened A/E firm is spurring redevelopment in an old industrial section of Little Rock.
Reconstruction Awards | Nov 15, 2019
Back on track: Union Terminal renovation and restoration
Painstaking care went into restoring Cincinnati’s train terminal/museum complex.
Reconstruction Awards | Nov 14, 2019
Museum at the Gateway Arch: Subterranean sensation
The project team used its creativity to overcome floods and other obstacles to construction.
Reconstruction Awards | Nov 13, 2019
Zachry Engineering Education Complex: Rethinking engineering education
Texas A&M’s engineering school builds for future growth.
Reconstruction Awards | Nov 12, 2019
Linode Headquarters: High-tech + historic
New headquarters mixes old and new to help this fast-growth company attract top talent.
Reconstruction Awards | Nov 11, 2019
Woolworth Tower Residences: What a view!
The one-time tallest building in the world is now home to an exclusive residential clientele.