flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Test run on the HP Z200 SFF Good Value in a Small Package

Test run on the HP Z200 SFF Good Value in a Small Package

We test a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.


By By Jeff Yoders, Contributing Editor | October 13, 2010
This article first appeared in the October 2010 issue of BD+C.

As the design and construction industry experiences continued difficulty in getting projects approved and built, the cost of computer hardware for architects, engineers, and construction professionals keeps going up. ZweigWhite’s 2010 “Information Technology Survey of Architecture, Engineering, Planning & Environmental Consulting Firms” found that although firms cut their IT budgets in 2009 for the first time in the survey’s history, they also expect IT spending levels to remain constant in 2010.

The high cost of workstation-class PCs is often cited as a reason for not upgrading hardware, or simply upgrading the software of current systems rather than buying new. Into the breach steps Hewlett-Packard, which has released a new small-form factor, workstation-class desktop in its Z line that combines the performance of its minitower machine with a smaller desktop chassis and a lower price.

I tested a new Z200 SFF workstation with an Intel Xeon X3470 four-core processor with eight gigabytes of memory (2.93 gigahertz), a terabyte hard drive, and three gigs of DDR 3 error-correcting code (ECC) RAM. Manufacturers commonly use ECC memory in servers because it’s designed to protect against critical errors resulting from component failures. ECC memory is also expensive, which explains much of the Z200 SFF’s approximately $2,000 cost (depending on configuration), still relatively low for an AEC-optimized workstation.

HP is about to introduce a new component to the Z200 SFF, too, an NVIDIA Quadro 600 graphics card that makes the machine work a lot better with graphically complex 3D programs such as Revit and AutoCAD. The Quadro 600 in my machine linked directly to my test machine’s monitor through an HD DisplayPort and provided crisp, fast frame-rates for all the benchmarks I ran. Previously, the Z200 could only carry ATI FirePro cards and the entry-level CAD NVIDIA Quadro 380.

What the Z200 SFF lacks in size it makes up for in convenience and ease of use. There are five USB connectors and a multiformat card reader on the front of the machine. On the back are six more USB ports, a VGA connector, a DVI connector, a serial port, a gigabit ethernet port, and two FireWire 400 ports. All ports are readily accessible and easy to connect to in a tight space because even with a flat-screen monitor perched on top of it the Z200 SFF is light and easy to move.

Like all machines in the Z series, the Z200 SFF has a handle to open the machine for easy access to its innards, no tools needed; by design, there isn’t much to upgrade on such a small desktop PC. There are two free slots in the machine, one PCI-E x4 slot and one PCI-E x1 slot; the Quadro graphics card occupies the remaining PCI-E x16 slot. Still, removing components is easy and requires no tools. Drive bays are housed in locking hinges marked in green, and all of the slotted cards can be removed and replaced without a screwdriver. The Z200 is powered by an 89% efficient 240-watt power supply, which works with the Performance Advisor software (included) to simplify system performance, driver performance, and system resource monitoring to keep it operating optimally.

The Z200 SFF’s real value for AEC professionals, however, is in its ability to perform quickly and capably with complex software applications such as Autodesk Revit, 3ds MAX, and Adobe’s Creative Suite 5. I installed all three and ran several megatasking scenarios, and the Quadro 600 was up to the task on all of them. Some of these scenarios included opening several large models simultaneously in both of the design programs and opening multiple images in Photoshop CS5.

While running the three memory-hog programs (Revit, 3ds MAX, and Adobe Photoshop CS5), I noticed very little loss in frame rate or machine slowdown. This is because the NVIDIA application configuration engine included with the graphics card automatically adjusted the graphics setting for each of the programs for optimized performance when I launched them. GPUs such as that of the Quadro 600 have a highly parallel structure that makes them more effective than a general-purpose CPU for the complex algorithms 3D design demands.

Using AutoCAD 2011, I was also able to take advantage of the graphics card’s higher image quality with AutoCAD Smooth Lines, a software-specific integration with the GPU that allows you to draw smooth, quality AutoCAD lines with no drop in frame rate. GPU acceleration was also a boon to the Adobe heavy-rendering programs (Photoshop, Fireworks, After Effects), as the graphics card is automatically configured to optimize their performance, too.

With ECC memory and the Quadro 600, the HP Z200 is, in my opinion, a great value for more than just entry-level CAD users. However, there’s not much room for upgradability, so do not buy this machine if you’re expecting to do much customization. Also, AEC users who intend to use 3D design programs should not get a graphics card below the Quadro 600. The ATI and Quadro FX 380 cards should work fine for entry-level CAD (AutoCAD LT or AutoCAD without using the 3D features such as the form tool) but not much else. BD+C

Jeff Yoders is a former senior associate editor at BD+C, specializing in coverage of BIM, CAD, and IT for AEC professionals. He blogs at http://www.bimboysblog.blogspot.com/

Related Stories

| Dec 17, 2010

How to Win More University Projects

University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.

| Dec 13, 2010

Energy efficiency No. 1 priority for commercial office tenants

Green building initiatives are a key influencer when tenants decide to sign a commercial real estate lease, according to a survey by GE Capital Real Estate. The survey, which was conducted over the past year and included more than 2,220 office tenants in the U.S., Canada, France, Germany, Sweden, the UK, Spain, and Japan, shows that energy efficiency remains the No. 1 priority in most countries. Also ranking near the top: waste reduction programs and indoor air.

| Dec 7, 2010

Are green building RFPs more important than contracts?

The Request for Proposal (RFP) process is key to managing a successful LEED project, according to Green Building Law Update. While most people think a contract is the key element to a successful construction project, successfully managing a LEED project requires a clear RFP that addresses many of the problems that can lead to litigation.

| Dec 7, 2010

Blue is the future of green design

Blue design creates places that are not just neutral, but actually add back to the world and is the future of sustainable design and architecture, according to an interview with Paul Eagle, managing director of Perkins+Will, New York; and Janice Barnes, principal at the firm and global discipline leader for planning and strategies.

| Dec 7, 2010

Green building thrives in shaky economy

Green building’s momentum hasn’t been stopped by the economic recession and will keep speeding through the recovery, while at the same time building owners are looking to go green more for economic reasons than environmental ones. Green building has grown 50% in the past two years; total construction starts have shrunk 26% over the same time period, according to “Green Outlook 2011” report. The green-building sector is expected to nearly triple by 2015, representing as much as $145 billion in new construction activity.

| Dec 7, 2010

USGBC: Wood-certification benchmarks fail to pass

The proposed Forest Certification Benchmark to determine when wood-certification groups would have their certification qualify for points in the LEED rating systemdid not pass the USGBC member ballot. As a result, the Certified Wood credit in LEED will remain as it is currently written. To date, only wood certified by the Forest Stewardship Council qualifies for a point in the LEED, while other organizations, such as the Sustainable Forestry Initiative, the Canadian Standards Association, and the American Tree Farm System, are excluded.

| Dec 7, 2010

Prospects for multifamily sector improve greatly

The multifamily sector is showing signs of a real recovery, with nearly 22,000 new apartment units delivered to the market. Net absorption in the third quarter surged by 94,000 units, dropping the national vacancy rate from 7.8% to 7.1%, one of the largest quarterly drops on record, and rents increased for the second quarter in a row.

| Dec 7, 2010

Hot rumor: Norman Foster designing Apple’s new campus

Lord Norman Foster, reportedly has been selected to design Apple’s new campus in Cupertino, Calif. If the news is true, Foster is a good match for Apple say experts. Foster built his celebrity by marrying big gestures to technological wizardry. And, unlike some starchitects, he has glommed onto the environmental revolution—something Apple has made a point of embracing, too.

| Dec 7, 2010

10 megacities of the near future

With Beijing, Shanghai, and Mumbai already on the global radar, where can the next wave of construction be found? Far beyond China, India, and even Brazil it’s predicted. The world’s next future megacities could include Istanbul, Turkey; Ho Chi Minh City, Vietnam; and Khartoum, Sudan, among others. Read about these emerging and little-known behemoths.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021