flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Texas Oncology continues to expand its reach

Healthcare Facilities

Texas Oncology continues to expand its reach

It is replacing and consolidating a number of its cancer care centers.


By John Caulfield, Senior Editor | July 27, 2021
A new cancer center in Fort Worth will replace an older existing facility
A new cancer center in Fort Worth will replace an older existing facility

While Texas’s cancer rate per 100,000 residents is among the lowest in the nation, more than 133,730 Texans will be diagnosed with cancer in 2021, including nearly 21,000 new breast cancer patients, according to The American Cancer Society’s estimates.

To expand access to comprehensive cancer care, Texas Oncology—with 500-plus physicians and 210 locations across the state—recently broke ground on a 22,300-sf cancer care center in Fort Worth’s Alliance Town Center. When it opens next year, the cancer center will provide medical oncology, hematology, radiation oncology and infusion treatments.

“The development of this new cancer care facility confirms our commitment to providing innovative comprehensive, and individualized care for patients across Texas,” says R. Steven Paulson, M.D., president and chairman of Texas Oncology.

 

AGGRESSIVE GROWTH

Texas Oncology's 26,000-sf facility in Denison, Texas, opened last month.

The recently opened cancer care center in Denison, Texas, consolidates two older facilities.

 

The building will replace an existing Texas Oncology site in Keller, Texas. The building team executing this project includes the developers Hillwood and Meridien, architects Corgan and E4H, and the general contractor DPR Construction.

Last month, Texas Oncology consolidated its locations in Sherman and Denison, Texas, into a new 26,000-sf cancer care center in Denison, with an integrated team of six physicians and more than 85 support staff.  And in April, Texas Oncology and Christus Health broke ground on an 85,000-sf Northeast Texas Cancer and Research Institute in Tyler, Texas, with an anticipated 2022 opening. The Tyler facility will include 30,000 sf of clinic space and nearly 3,000 sf for research. Christus Health will house a 7,500-sf advanced imaging center. Another 10,000 sf will support the surgical oncology programs of the Louise Herrington Cancer Center.

Related Stories

| Aug 11, 2010

MOB added to new hospital project

A late-2009 ground breaking is planned for a $20 million medical office building on the grounds of the $211 million, 106-bed Loma Linda University Medical Center in Murrieta, Calif., which itself is under construction. Minneapolis-based Frauenshuh HealthCare Real Estate Solutions is developing the five-story, 160,000-sf MOB, which will accommodate 60 physician offices.

| Aug 11, 2010

Rehabilitation center helps patients transition

Construction is under way on the Polytrauma Transitional Rehabilitation Center on the VA Medical Center campus in Richmond, Va. The $8 million, 22,000-sf facility will provide physical therapy, housing, and education to veterans as part of their transition back into their communities. The center was designed by HDR, Alexandria, Va.

| Aug 11, 2010

Medical office building planned in Fort Worth, Texas

Dallas-based TGS Architects has unveiled its design for the five-story, 130,000-sf Plaza Medical Office Building, planned for Fort Worth, Texas. The Class A development will include space for orthopedic care, surgery, breast center, diagnostic imaging, cardiovascular, and rehabilitation therapy services.

| Aug 11, 2010

Philadelphia cancer center seeks LEED certification

The New York office of Thornton Tomasetti provided structural engineering services for the Ruth and Raymond Perelman Center for Advanced Medicine in Philadelphia, a $232 million medical research center and advanced treatment center for cancer and cardiovascular disease. Designed by a joint venture of Perkins Eastman Architects and Rafael Vinõly Architects, the 340,000-sf facility will hous...

| Aug 11, 2010

High-level NICU opens in Washington, D.C.

Design to the highest distinction available by the American Academy of Pediatrics, the new Level IIIC neonatal intensive care unit (NICU) at Children's National Medical Center in Washington D.C., is equipped to care for the sickest premature babies, including those that require open-heart surgery. The 54-bed facility, designed by Karlsberger with KLMK Group as space planner, is four times large...

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

| Aug 11, 2010

New hospital expands Idaho healthcare options

Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...

| Aug 11, 2010

Manhattan's Gouverneur Healthcare Services tops out renovation, expansion

One year after breaking ground, the Building Team for the renovation and expansion of the Gouverneur Healthcare Services facility on Manhattan's Lower East Side topped out the $180 million project. Designed by New York-based RMJM, the development involves a 316,000-sf renovation and 108,000-sf addition that will house a 295-bed nursing facility and five-story ambulatory care center.

| Aug 11, 2010

Decline expected as healthcare slows, but hospital work will remain steady

The once steady 10% growth rate in healthcare construction spending has slowed, but hasn't entirely stopped. Spending is currently 1.7% higher than the same time last year when construction materials costs were 8% higher. The 2.5% monthly jobsite spending decline since last fall is consistent with the decline in materials costs.

| Aug 11, 2010

Construction under way on LEED Platinum DOE energy lab

Centennial, Colo.-based Haselden Construction has topped out the $64 million Research Support Facilities, located on the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) campus in Golden, Colo. Designed by RNL and Stantec to achieve LEED Platinum certification and net zero energy performance, the 218,000-sf facility will feature natural ventilation through operable ...

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021