flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Texas Rangers announce plans for $1 billion retractable roof ballpark

Sports and Recreational Facilities

Texas Rangers announce plans for $1 billion retractable roof ballpark

The new stadium will replace Globe Life Park, which is only 22 years old.


By Mike Chamernik, Associate Editor | May 20, 2016
Texas Rangers announce plans for $1 billion retractable roof ballpark

Globe Life Park in Arlington. Photo: Brandi Korte/Creative Commons

On Friday afternoon, the Texas Rangers announced that they would be building a new $1 billion, retractable roof ballpark in the Dallas suburb of Arlington.

The announcement is a surprise for a few reasons. One, there has been no rumors or speculation that the baseball club was looking to build a new home. Two, the Rangers’ current stadium, Globe Life Park in Arlington, only opened in 1994.

The Star-Telegram reports that the $1 billion cost will be split equally between the city and the Rangers, and that the agreement will keep the team in Arlington until 2054. The tax dollars will come from a half-cent sales tax, a 2% hotel occupancy tax, and a 5% car rental tax. The proposal requires voter approval on November 8.

 

 

The retractable roof and air conditioning system would be a game-changer for the players and fans. Temperatures in Arlington regularly reach the mid-90s and triple digits during the summer. 

Construction on the new park could begin as soon as late 2017, and the rangers may move in before their lease at Globe Life Park expires in 2023.

This fall, construction will begin on the $200 million Texas Live! The seven-acre development will serve the current and proposed ballparks, and it will have 100,000 sf of restaurant, bar, and retail space, 35,000 sf of convention space, and a 300-bed luxury hotel.

Related Stories

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors

A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Bowdoin College has country's first newly constructed LEED-certified ice arena

Bowdoin College's new Sidney J. Watson Arena, dedicated January 18, 2009, has become the first newly constructed ice arena in the United States to earn coveted LEED (Leadership in Energy and Environmental Design) certification from the United States Green Building Council (USGBC).

| Aug 11, 2010

Gilbane, Manhattan Construction top BD+C's ranking of the nation's 50 largest K-12 school contractors

A ranking of the Top 50 K-12 School Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Populous selected to design 'crystalline skin' stadium for 2014 Winter Olympics

Russian officials have selected global architect Populous to design the main stadium for the 2014 Winter Olympic and Paralympic Games in Sochi, Russia. The 40,000-seat stadium will feature a crystalline skin that "engages with its surroundings by day and provides an iconic representation of the color and spectacle of the games when illuminated at night," said Populous senior principal John Barrow.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021