flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Texas Rangers’ Globe Life Field progresses toward its 2020 completion date

Sports and Recreational Facilities

Texas Rangers’ Globe Life Field progresses toward its 2020 completion date

The stadium will be the cornerstone of the Texas Live! Development.


By David Malone, Associate Editor | April 4, 2019

All renderings courtesy HKS Architects

Globe Life Field, the Texas Rangers currently-under-construction ballpark, is progressing towards its March 2020 completion date. The ballpark is designed by HKS architects with VLK Architects acting as the associate architect. The stadium is the cornerstone of Texas Live!, a dining, entertainment, and luxury hospitality complex that has been under construction since 2016.

One of the biggest functional changes Globe Life Field will provide compared to the Rangers’ current home ballpark is the new retractable roof that will keep players out of the Texas heat. Another large change will be the synthetic playing surface from Shaw Sports Turf. The synthetic grass will provide similar aesthetics to natural grass and will be combined with natural clay basepaths.

 

Globe Life Stadium concourse

 

The $1.1 billion, 1.7 million-sf stadium will be built on a 13-acre site and have a capacity of 40,000. It will have five entry gates to ease crowd congestion upon entering and exiting the stadium. When complete, Globe Life Field will feature 725 concrete columns throughout and 780 piers drilled into the ground that make up the building foundation.

 

See Also: HKS unveils retractable-roof ballpark in Japan

 

A series of experiences for fans will include clubs, themed restaurants, retail, and a Hall of Fame exhibit. Globe Life Park will be the MLB’s first new ballpark since the Atlanta Braves Opened SunTrust Park in 2017. Manhattan Construction Company is the general contractor. Walter P Moore is the structural engineer.

 

Behind home plate at Globe Life Field

 

Outside of Globe Life Field

Related Stories

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Nov 7, 2013

Fitness center design: What do higher-ed students want?

Campus fitness centers are taking their place alongside student centers, science centers, and libraries as hallmark components of a student-life experience. Here are some tips for identifying the ideal design features for your next higher-ed fitness center project. 

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

| Oct 28, 2013

Urban growth doesn’t have to destroy nature—it can work with it

Our collective desire to live in cities has never been stronger. According to the World Health Organization, 60% of the world’s population will live in a city by 2030. As urban populations swell, what people demand from their cities is evolving.

| Oct 18, 2013

Researchers discover tension-fusing properties of metal

When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread. 

| Oct 8, 2013

Toronto Maple Leafs arena converted to university recreation facility

Using steel reinforcement and massive box trusses, a Building Team methodically inserts four new floors in the landmark arena while preserving and restoring its historic exterior.

| Oct 1, 2013

13 structural steel buildings that dazzle

The Barclays Center arena in Brooklyn and the NASCAR Hall of Fame in Charlotte, N.C., are among projects named 2013 IDEAS2 winners by the American Institute of Steel Construction.

| Sep 26, 2013

6 ways to maximize home-field advantage in sports venue design

Home-field advantage can play a significant role in game outcomes. Here are ways AEC firms can help create the conditions that draw big crowds, energize the home team to perform better, and disrupt visiting players.

| Sep 24, 2013

8 grand green roofs (and walls)

A dramatic interior green wall at Drexel University and a massive, 4.4-acre vegetated roof at the Kauffman Performing Arts Center in Kansas City are among the projects honored in the 2013 Green Roof and Wall Awards of Excellence. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021