flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

These three hoteliers make up two-thirds of all new hotel development in the U.S.

Hotel Facilities

These three hoteliers make up two-thirds of all new hotel development in the U.S.

With a combined 3,523 projects and 400,490 rooms in the pipeline, Marriott, Hilton, and InterContinental dominate the U.S. hotel construction sector.


By Lodging Econometrics | October 31, 2022
These three hoteliers make up two-thirds of all new hotel development in the U.S.

Photo: Jonathan Kemper via Unsplash

According to the quarterly United States Construction Pipeline Trend Report from Lodging Econometrics (LE), the franchise companies with the largest construction pipelines at the end of Q3 2022 are led by Marriott International with 1,385 projects/168,725 rooms. Following Marriott is Hilton Worldwide with 1,351 projects/152,383 rooms, and InterContinental Hotels Group (IHG) with 787 projects/79,382 rooms.

Combined, these three companies account for 66% of the projects and 64% of the rooms in the total pipeline. Each company has seen growth year-over-year.

These three franchise companies also have the most projects and rooms in each stage of the construction pipeline. Marriott leads with the greatest number of projects in the under construction stage with 259 projects/35,946 rooms, then Hilton with 248 projects/31,698 rooms, and IHG with 135 projects/15,688 rooms currently under construction.

At the close of the third quarter, Marriott also leads with the most projects scheduled to start construction in the next 12 months with 739 projects/87,626 rooms, followed by IHG with 484 projects/46,957 rooms, and Hilton with 333 projects/38,043 rooms.

Hilton set record high project and rooms counts in the early planning stage at the Q3 close, totaling 770 projects/82,642 rooms. Marriott currently has 387 projects/45,153 rooms in early planning and IHG closed the quarter with 168 projects/16,737 rooms in the early planning stage.

Hotel construction by brand 

The brands of each of these companies with the largest number of projects in the pipeline at Q3 are Hilton’s Home2 Suites with 494 projects/50,809 rooms; IHG’s Holiday Inn Express with 297 projects/28,323; and Marriott’s TownePlace Suites with 291 projects/27,329 rooms. Other prominent brands in the pipeline for these franchise companies are the Hampton by Hilton brands with 281 projects/28,543 rooms; Marriott’s Fairfield Inn with 238 projects/21,988 rooms; and IHG’s Avid Hotel brand with 135 projects/11,445 rooms.

Through the end of the third quarter, Marriott opened 102 new hotels/12,908 rooms. Hilton opened 90 new hotels/10,834 rooms, and IHG opened 40 projects/4,120 rooms.


ALSO SEE: Top 115 Hotel Sector Architecture and AE Firms for 2022


 

LE analysts forecast Marriott will open the most new hotels in 2023 with 168 hotels/20,952 rooms. Next is Hilton with 136 new hotels/17,049 rooms, followed by IHG with 89 new hotels/9,588 rooms. In 2024, LE forecasts that Marriott will open 192 new hotels/22,815 rooms. Hilton is expected to open 154 new hotels/16,967 rooms and IHG is expected to open 142 new hotels/14,596 rooms.

Related Stories

Hotel Facilities | Apr 11, 2017

What can hotels learn from Airbnb?

This new kid on the hospitality block is actually an extension of a long-standing tradition of lodging alternatives that range from renting villas in Italy to choosing timeshare properties in Florida.

Reconstruction & Renovation | Mar 30, 2017

Waldorf Astoria New York to undergo massive renovation

Skidmore, Owings & Merrill and Pierre-Yves Rochon prepared the designs for what will be one of the most complex and intensive landmark preservation efforts in New York City history.

Hotel Facilities | Mar 14, 2017

Hotels are becoming the favored places for retailers and consumer products to bolster their brands

Several high-profile names have launched hospitality divisions, often with well-established management partners.

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Hotel Facilities | Feb 20, 2017

The future of hotel design: Human-centered

Change is inevitable and it impacts on everything, not least on the way we design.

Market Data | Feb 16, 2017

How does your hospital stack up? Grumman/Butkus Associates 2016 Hospital Benchmarking Survey

Report examines electricity, fossil fuel, water/sewer, and carbon footprint.

Hotel Facilities | Feb 15, 2017

Morphosis redesigns Swiss hotel rooms as custom ‘aesthetic experiences’

The redesigned rooms focused on scale, color, tactility, unexpected form, and connections to the natural context.

Hotel Facilities | Jan 30, 2017

New renderings of the 1966 Century Plaza Hotel’s redevelopment

The redevelopment project got underway last summer and is expected to be completed in 2018.

Hotel Facilities | Jan 25, 2017

New Denver hotel will integrate historic 130-year-old fire station into its design

The 1883 Denver Hose Company No.1 building will be fully restored as part of the project.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021