flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

These three hoteliers make up two-thirds of all new hotel development in the U.S.

Hotel Facilities

These three hoteliers make up two-thirds of all new hotel development in the U.S.

With a combined 3,523 projects and 400,490 rooms in the pipeline, Marriott, Hilton, and InterContinental dominate the U.S. hotel construction sector.


By Lodging Econometrics | October 31, 2022
These three hoteliers make up two-thirds of all new hotel development in the U.S.

Photo: Jonathan Kemper via Unsplash

According to the quarterly United States Construction Pipeline Trend Report from Lodging Econometrics (LE), the franchise companies with the largest construction pipelines at the end of Q3 2022 are led by Marriott International with 1,385 projects/168,725 rooms. Following Marriott is Hilton Worldwide with 1,351 projects/152,383 rooms, and InterContinental Hotels Group (IHG) with 787 projects/79,382 rooms.

Combined, these three companies account for 66% of the projects and 64% of the rooms in the total pipeline. Each company has seen growth year-over-year.

These three franchise companies also have the most projects and rooms in each stage of the construction pipeline. Marriott leads with the greatest number of projects in the under construction stage with 259 projects/35,946 rooms, then Hilton with 248 projects/31,698 rooms, and IHG with 135 projects/15,688 rooms currently under construction.

At the close of the third quarter, Marriott also leads with the most projects scheduled to start construction in the next 12 months with 739 projects/87,626 rooms, followed by IHG with 484 projects/46,957 rooms, and Hilton with 333 projects/38,043 rooms.

Hilton set record high project and rooms counts in the early planning stage at the Q3 close, totaling 770 projects/82,642 rooms. Marriott currently has 387 projects/45,153 rooms in early planning and IHG closed the quarter with 168 projects/16,737 rooms in the early planning stage.

Hotel construction by brand 

The brands of each of these companies with the largest number of projects in the pipeline at Q3 are Hilton’s Home2 Suites with 494 projects/50,809 rooms; IHG’s Holiday Inn Express with 297 projects/28,323; and Marriott’s TownePlace Suites with 291 projects/27,329 rooms. Other prominent brands in the pipeline for these franchise companies are the Hampton by Hilton brands with 281 projects/28,543 rooms; Marriott’s Fairfield Inn with 238 projects/21,988 rooms; and IHG’s Avid Hotel brand with 135 projects/11,445 rooms.

Through the end of the third quarter, Marriott opened 102 new hotels/12,908 rooms. Hilton opened 90 new hotels/10,834 rooms, and IHG opened 40 projects/4,120 rooms.


ALSO SEE: Top 115 Hotel Sector Architecture and AE Firms for 2022


 

LE analysts forecast Marriott will open the most new hotels in 2023 with 168 hotels/20,952 rooms. Next is Hilton with 136 new hotels/17,049 rooms, followed by IHG with 89 new hotels/9,588 rooms. In 2024, LE forecasts that Marriott will open 192 new hotels/22,815 rooms. Hilton is expected to open 154 new hotels/16,967 rooms and IHG is expected to open 142 new hotels/14,596 rooms.

Related Stories

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| May 22, 2012

Batson-Cook names Partin VP of Business Development

Partin joins general contractor from Georgia Hospital Association.

| May 16, 2012

AEG releases 3D video of L.A.'s Farmers Field

The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

McCarthy completes Santa Barbara Cottage Hospital Replacement Facility

The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021