Thornton Tomasetti, the international engineering firm, announces the acquisition of Fore Solutions, a green building consulting firm that will allow Thornton Tomasetti to significantly expand its sustainability consulting services and integrate green objectives across all its practices.
The new Building Sustainability practice will be headed by Gunnar Hubbard, Fore Solution’s principal and founder, who becomes a principal at Thornton Tomasetti. Wolfgang Werner, formerly director of sustainability, becomes a vice president and head of the practice’s East U.S. region.
Key points:
- The phenomenal growth of the green building movement in recent years means that sustainability is here to stay. By 2015, approximately half of new construction in the United States is estimated to incorporate some measure of sustainability.
- The addition of Fore Solutions gives Thornton Tomasetti expanded experience and an established brand in the green building world.
- With the creation of its Green Building Strategy Team in 2007 and a sustainability department in 2010, Thornton Tomasetti started offering sustainability services and performing sustainability project work. The addition of Fore Solutions will greatly advance Thornton Tomasetti’s sustainability services effort to address clients’ needs for high-performance, energy-efficient buildings.
The Fore Solutions team will remain based in Portland, Maine, which is now a Thornton Tomasetti office within the East U.S. region. BD+C
Related Stories
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
| Oct 13, 2010
Hospital and clinic join for better patient care
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.
| Oct 13, 2010
Biloxi’s convention center bigger, better after Katrina
The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.
| Oct 13, 2010
Tower commemorates Lewis & Clark’s historic expedition
The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.
| Oct 13, 2010
Maryland replacement hospital expands care, changes name
The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.