flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Three new members elected to AISC Board of Directors

Three new members elected to AISC Board of Directors

New members will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.


By Posted by Tim Gregorski, Senior Editor | October 15, 2012

The American Institute of Steel Construction (AISC) announced the election of three new members to its Board of Directors at its recent Annual Meeting in Miami. Robert Philip Stupp, Jr., executive vice president of Stupp Bros., Inc., St. Louis, Lawrence F. Kruth, P.E., vice president of engineering, technology and safety at Douglas Steel Fabricating Corporation, Lansing, Mich., and Mark W. Trimble, P.E., marketing manager at Huntington Steel & Supply Company, Huntington, W.Va., will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.

Stupp currently serves as executive vice president of Stupp Bros., Inc., St. Louis, and is also president of its fabrication segment and subsidiary Hammert's Iron Works, Inc.  Previously, he served for three years as assistant general manager for Stupp's bridge division, Stupp Bridge Company, and before that was vice president for more than a decade when it was named Stupp Bros. Bridge & Iron Co. For the past nine years, he's served as director of the Central Fabricators Association in Chicago and is also a member of AISC's Ad Hoc Committee on Barcode Standards. His father is Robert (Bob) P. Stupp, a former AISC chairman of the board and the longest-serving board member in AISC's history. AISC's prestigious Robert P. Stupp Award for Leadership Excellence was created in 1998 in his honor in recognition of his unparalleled leadership in the steel construction industry.

Kruth is vice president of engineering, technology and safety at Douglas Steel Fabricating Corporation, Lansing, Mich., and a member of its Board of Directors. With more than 30 years of structural engineering experience, he's responsible for managing the engineering department, advancing technology in the company as well as all safety for the shop and field. Previously, he served for seven years as a project manager for the company. He serves as Chair of the AISC Safety Committee and is a member of the AISC Research Committee. He's also a member of AISC's TC6 Connection Design Specification Committee, AISC's TC13 Quality Control & Assurance Specification Committee as well as a member of the AISC Specification Committee. He's been appointed to the MIOSHA Part 26, Structural Steel Erection Advisory Committee and MIOSHA Part 10, Lifting & Digging Advisory Committee.

Trimble is marketing manager for Huntington Steel & Supply Company, Huntington, W.Va., and one of six executive team members charged with business development and client satisfaction. He's been with the company for about 20 years and started out as manager of its structural fabrication division. Previously, he owned and managed an engineering and surveying practice in Kentucky. He's a past president of both the West Virginia Steel Fabricators Association and West Virginia Society of Professional Engineers. Currently he's a member of AISC's Planning Committee for NASCC: The Steel Conference. +

Related Stories

Healthcare Facilities | Dec 19, 2023

A new hospital in Duluth, Minn., is now the region’s largest healthcare facility

In Duluth, Minn., the new St. Mary’s Medical Center, designed by EwingCole, is now the largest healthcare facility in the region. The hospital consolidates Essentia Health’s healthcare services under one roof. At about 1 million sf spanning two city blocks, St. Mary’s overlooks Lake Superior, providing views on almost every floor of the world’s largest freshwater lake.

Government Buildings | Dec 19, 2023

New Pennsylvania State Archives building holds documents dating back to 1680

Work was recently completed on a new Pennsylvania State Archives building in Harrisburg, Penn. The HGA-designed, 146,000-sf facility offers numerous amenities, including computers, scanners, printers, a kitchenette with seating, lockers, a meeting room, a classroom, an interactive video wall, gallery, and all-gender restrooms. The features are all intended to provide a welcoming and comfortable environment for visitors.

Urban Planning | Dec 18, 2023

The impacts of affordability, remote work, and personal safety on urban life

Data from Gensler's City Pulse Survey shows that although people are satisfied with their city's experience, it may not be enough.

MFPRO+ News | Dec 18, 2023

Berkeley, Calif., raises building height limits in downtown area

Facing a severe housing shortage, the City of Berkeley, Calif., increased the height limits on residential buildings to 12 stories in the area close to the University of California campus.

Green | Dec 18, 2023

Class B commercial properties gain more from LEED certification than Class A buildings

Class B office properties that are LEED certified command a greater relative benefit than LEED-certified Class A buildings, according to analysis from CBRE. The Class B LEED rent advantage over non-LEED is about three times larger than the premium earned by Class A LEED buildings.

Codes and Standards | Dec 18, 2023

ASHRAE releases guide on grid interactivity in the decarbonization process

A guide focusing on the critical role of grid interactivity in building decarbonization was recently published by ASHRAE. The Grid-Interactive Buildings for Decarbonization: Design and Operation Resource Guide provides information on maximizing carbon reduction through buildings’ interaction with the electric power grid.

Architects | Dec 18, 2023

Perkins&Will’s new PRECEDE tool provides access to public health data to inform design decisions

Perkins&Will recently launched a free digital resource that allows architects and designers to access key public health data to inform design decisions. The “Public Repository to Engage Community and Enhance Design Equity,” or PRECEDE, centralizes demographic, environmental, and health data from across the U.S. into a geospatial database.

Sports and Recreational Facilities | Dec 15, 2023

San Antonio Spurs’ new practice facility aims to help players win championships and maintain well-being

Designed by ZGF, the Victory Capital Performance Center uses biophilic design to promote better health and wellness on and off the court.

Affordable Housing | Dec 14, 2023

What's next for affordable housing in 2024?

As 2023 draws to a close, GBBN’s Mary Jo Minerich and Amanda Markovic, AIA sat down to talk about the future. What’s next in terms of trends, technology, and construction of affordable housing?

75 Top Building Products | Dec 13, 2023

75 top building products for 2023

From a bladeless rooftop wind energy system, to a troffer light fixture with built-in continuous visible light disinfection, innovation is plentiful in Building Design+Construction's annual 75 Top Products report. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021