flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tianmen Mountain glass skywalk opens to the public

Glass and Glazing

Tianmen Mountain glass skywalk opens to the public

Acrophobics beware: China’s Zhangjiajie National Forest Park just got a little bit (or a lot) more terrifying.


By David Malone, Associate Editor | August 22, 2016

Tianmen Mountain cable cars and Tongtian Avenue. Photo: Huangdan2060, Wikimedia Public Domain.

The thought of walking along a five-foot-wide path coiled around the side of a mountain like a python on its prey while suspended 4,600 feet in the air is enough to make many people get a bit wobbly in the knees. But take that same path, and give it a clear glass bottom, and even those who deny a fear of heights may begin to sweat a little.

Well, now you don’t have to just imagine this path, you can experience it. The Coiling Dragon Cliff recently opened on Tianmen Mountain in the southern Chinese province of Hunan and offers tourists a chance to venture along a 100-meter-long, glass-bottomed walkway floating over a 4,600-foot drop.

In addition to surreal views of the surrounding mountainous landscape, the walkway overlooks Tongtian Avenue, a winding, 99-turn road weaving back and forth up the mountain. The new Coiling Dragon Cliff joins Zhangjiajie National Forest Park’s two other skywalks and the longest glass-bottomed bridge (1,410 feet) in the world.

If that still hasn’t satiated your inner daredevil, a cable car that picks people up at a nearby railroad and deposits them at the top of Tianmen Mountain, a ride totaling around 30 minutes from start to finish and one that is said to be the world's longest cable car ride, is also among the mountain's attractions.

Naturally, the first question that pops into most people’s minds with glass-bottomed structures is safety. And in an effort to prove just how safe these glass-bottomed structures are, park authorities deliberately cracked the glass of one of the bridge’s panels and drove a Volvo XC90, which has a curb weight around 4,300 pounds, over it.

They also treated the glass like a "Test Your Strength" carnival game and smashed it with sledgehammers. None of the tests resulted in completely breaking through any of the three layers of glass.

Related Stories

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

AIA Course: Historic Masonry — Restoration and Renovation

Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.

| Aug 11, 2010

BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey

The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021