flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tips to make optimal use of salvaged materials

Codes and Standards

Tips to make optimal use of salvaged materials

Integrated teams, staging warehouse, and looking early and often, among recommendations.


By Peter Fabris, Contributing Editor | July 16, 2020

Courtesy Pixabay

A Skanska executive offers 10 tips to make the best use of salvaged construction materials in a Living Building post. The advice includes:

· Early integration of the project team. This allows contractors to advise designers early on the practicality of using salvaged materials.

· Work with local reuse organizations. These groups obtain materials from deconstructed buildings and may have what you need close by.

· Look for opportunities to source materials. Even ordinary buildings contain materials that can be of use. Look early and often for these treasures.

· Obtain a staging warehouse. Setting aside a portion of a garage or other building, or renting a storage unit can fill the bill.

· Be ready in the schematic design phase. This is the best stage to analyze salvage possibilities.

· Know hurdles and limitations. Salvage projects may face technical challenges that don’t exist for new materials and products including warranties, specifications, and ratings for things like structural materials, mechanical equipment, and plumbing.

Related Stories

| Apr 19, 2012

Michigan legislature tackling controversial rules on electricians

A fight is brewing in the Michigan legislature over how many fully qualified electricians must be present during electrical work when apprentices also are on hand.

| Apr 19, 2012

Washington city may base building code on rising sea level due to global warming

Aberdeen may become the first city in Washington to base a building code on rising oceans and global warming.

| Apr 19, 2012

CSI webinar on energy codes and building envelopes

This seminar will review recent changes in energy codes, examples of building enclosure wall assemblies for code compliance, potential moisture management and durability challenges, and design tools to assess and minimize potential problems.

| Apr 19, 2012

Innovative plan for storm water in Philadelphia gets EPA’s OK

Philadelphia's $2 billion plan to manage its storm water with green methods including porous pavement, green roofs, and more trees, was officially approved last week by the U.S. Environmental Protection Agency.

| Apr 19, 2012

LEED 2012 to include new credit category for transit-oriented development

The updated LEED 2012 system will introduce a new credit category, “Location and Transportation,” to encourage development oriented around public transit and more walkable communities.

| Apr 17, 2012

FMI report examines federal construction trends

Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.

| Apr 16, 2012

University of Michigan study seeks to create efficient building design

The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.

| Apr 13, 2012

Congress’s action doesn’t mean Pentagon can’t build LEED gold structures

Though Congress passed a defense budget preventing the Department of Defense from spending money to achieve LEED gold or platinum certification, the Pentagon may still end up constructing buildings to those standards.

| Apr 13, 2012

International Living Building Institute certifies first two Net Zero Energy buildings

A community building in Oregon and an office building in California are the first two projects to earn net-zero status under the International Living Building Institute’s Net Zero Energy Certification program.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021