A Skanska executive offers 10 tips to make the best use of salvaged construction materials in a Living Building post. The advice includes:
· Early integration of the project team. This allows contractors to advise designers early on the practicality of using salvaged materials.
· Work with local reuse organizations. These groups obtain materials from deconstructed buildings and may have what you need close by.
· Look for opportunities to source materials. Even ordinary buildings contain materials that can be of use. Look early and often for these treasures.
· Obtain a staging warehouse. Setting aside a portion of a garage or other building, or renting a storage unit can fill the bill.
· Be ready in the schematic design phase. This is the best stage to analyze salvage possibilities.
· Know hurdles and limitations. Salvage projects may face technical challenges that don’t exist for new materials and products including warranties, specifications, and ratings for things like structural materials, mechanical equipment, and plumbing.
Related Stories
| Feb 17, 2012
AGC advocates for federal procurement reform
Ensure that small business goals take into consideration actual small business capacity in relevant specialty markets.
| Feb 17, 2012
Codes not to blame for Anchorage roof collapses following heavy snows
Design or construction problems likely contributed to the collapses, according to city officials.
| Feb 17, 2012
Comment period opens March 1 for LEED 2012 update
USGBC says that LEED's strength comes from its continuous evolution.
| Feb 17, 2012
OSHA training videos on proper respirator use available online
17 short videos to help workers learn about the proper use of respirators on the job.
| Feb 17, 2012
Union/employer collaboration on the rise aimed at exceeding OSHA safety standards
Unions have learned to help employers win contracts with bids made competitive through good safety practices.
| Feb 16, 2012
Gain greater agility and profitability with ArchiCAD BIM software
White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.
| Feb 9, 2012
Initiative to sell off under-used federal property gaining momentum
The bill is similar to a White House planto cut $8 billion worth of building costs by the end of the 2012 fiscal year, and to establish a panel to identify other sites worth selling or donating to nonprofits or state and local governments.
| Feb 9, 2012
Computer tool helps engineers design roof cladding using Canada's building code
Easier to design roof cladding that can withstand winds in a given area.
| Feb 9, 2012
Webinar focuses on lessons learned from LEED-certified industrial project
This case study will focus on strategies used to save the client money, achieve certification, and effectively market success once the project was complete.