Tishman Construction Corporation is managing the construction of a new, $160-million, 14-story, 510,000-sf Philadelphia Family Courthouse for the Pennsylvania Department of General Services (DGS) at the northwest corner of 15th and Arch streets. With excavation almost complete and foundations having begun, the building is planned to be completed by the Spring of 2014.
The Family Courthouse project is the largest construction project in Philadelphia since the Pennsylvania Convention Center expansion and the renovation of the former 30th Street Post Office for the IRS. Tishman successfully delivered the convention center three months early as part of a joint venture.
The courthouse building, designed by EwingCole, is pursuing LEED Silver certification. The first level of the building will include the main entrance, court queuing and security, a vehicular port for prisoners being brought to the building for court appearances, building support areas, and the parking lobby. The second level will include court support offices, prisoner holding cells, and a public vending area accessed by elevator and escalator. BD+C
Related Stories
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Nov 14, 2011
VanSumeren appointed to Traco general manager
VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco.
| Nov 11, 2011
By the Numbers
What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 11, 2011
AIA: Engineered Brick + Masonry for Commercial Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Nov 11, 2011
How Your Firm Can Win Federal + Military Projects
The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.
| Nov 10, 2011
BD+C's 28th Annual Reconstruction Awards
A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.
| Nov 10, 2011
Grousbeck Center for Students & Technology opens doors
New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.