flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tishman delivers Revel six weeks early

Tishman delivers Revel six weeks early

Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.


By Posted by Tim Gregorski, Senior Editor | May 9, 2012
Tishman managed the construction for the project, which includes 1,898 guest roo
Tishman managed the construction for the project, which includes 1,898 guest rooms with ocean views, a 130,000-sf casino, a larg

Tishman Construction Corp. completed Revel, a $2.4-billion beachfront destination, six weeks early. Tishman was contracted to provide construction management services for this 20-acre, 47-story resort--which features nearly 1,000 feet of beach frontage during 2007--and despite a pause in construction, turned over 6.3 million-sf of space in time for the hotel’s preview on April 2, 2012.

Tishman managed the construction for the project, which includes 1,898 guest rooms with ocean views, a 130,000-sf casino, a large performance space with capacity for more than 5,000 fans, a more intimate performance space for 700 people, retail spaces, restaurants, an expansive spa, indoor and outdoor pools, a four-story nightclub, and meeting space. 

Also included is 250,000-sfof back-of-house function space and a 50,000-sf warehouse with full loading dock access, as well as a car parking garage for more than 7,000 vehicles and a central utility plant to service the project.

In total, Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass--equivalent to more than 16 football fields. 

Furthermore, Tishman installed more than 5 million pounds of sheet metal and over 7,500 plumbing fixtures. +

Related Stories

| Feb 7, 2012

Kawneer and Traco combine portfolios

Portfolio includes curtain wall systems, windows, entrances and framing systems.

| Feb 7, 2012

Lubbers promoted to creative director at Wight & Co.

Lubbers has been instrumental in many recent high profile Wight projects, including the College of DuPage Student Resource Center, Seaton Computing Center, The Adler Planetarium Sky Theater transformation and UNO Charter Schools.

| Feb 7, 2012

Shepley Bulfinch opens San Francisco office

This expansion establishes a physical presence that builds on a portfolio of work for institutional clients on the West Coast, dating to the development of the original Stanford University campus in 1891

| Feb 7, 2012

Thornton Tomasetti opens new office in Denver

The firm, which now has 25 offices internationally, opened the new office to better serve current and potential clients in the western Central region and Mountain States.

| Feb 6, 2012

Slight increase in nonres construction spending expected in 2012, growth projected for 2013

Commercial sector expected to lead real estate recovery.

| Feb 6, 2012

FMI releases 2012 Construction Productivity Report

Downsizing has resulted in retaining the most experienced and best-trained personnel who are the most capable of working more efficiently and harder.

| Feb 6, 2012

Kirchhoff-Consigli begins Phase 2 renovations at FDR Presidential Library and Museum

EYP Architecture & Engineering is architect for the $35 million National Archives Administration project.

| Feb 6, 2012

Batson-Cook announces the appointment of Hall as president

Hall will manage and direct all aspects of the firm’s day-to-day operations. He will be based in Batson-Cook’s Atlanta office.

| Feb 6, 2012

Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation

Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021