flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tokyo down to two finalists for Olympic Stadium design

Sports and Recreational Facilities

Tokyo down to two finalists for Olympic Stadium design

Both cost less than the Zaha Hadid proposal that was scrapped over the summer.


By Mike Chamernik, Associate Editor | December 16, 2015
Tokyo down to two finalists for Olympic Stadium design

Design A, from Japanese architect Kengo Kuma. Images: Japan Sports Council

The Japanese government revealed the two final designs for its Olympic Stadium for the 2020 games in Japan, as the Telegraph reported. The proposals will now be open to comments, and will eventually be up for a jury vote. The winning design will be selected by the end of the year.

The two projects’ designers have been kept anonymous, but they are believed to be Japanese architects Kengo Kuma and Toyo Ito, according to Dezeen.

Design A, reportedly from Kengo Kuma, is a 164-foot-tall, ring-shaped stadium that has wood latticework, a flat roof, and columns supporting viewing terraces. Design B, from Toyo Ito, according to Dezeen, is 178 feet tall, oval-shaped, and has exterior glass walls. Design A is estimated to cost $1.25 billion (¥153 billion) and Design B’s price has been pegged slightly above that ($1.26 billion, or ¥153.7 billion). 

Japan cancelled Zaha Hadid’s Olympic Stadium plan in July for numerous reasons, with rising costs as the main issue. The stadium was projected to cost around $2 billion, or 252 billion yen, after revisions and delays in design and construction. 

Though the venue won’t be open for the 2019 Rugby World Cup as originally planned, the new stadium is expected to be completed in time to host the 2020 games. 

 

Design B, from Toyo Ito

Related Stories

Sports and Recreational Facilities | May 6, 2016

NBA’s Atlanta Hawks to build new practice center with attached medical facilities

The team will have easy access to an MRI machine, 3D motion capture equipment, and in-ground hydrotherapy. 

BIM and Information Technology | May 2, 2016

How HDR used computational design tools to create Omaha's UNO Baxter Arena

Three years after writing a white paper about designing an arena for the University of Nebraska Omaha, HDR's Matt Goldsberry says it's time to cherry-pick the best problem-solving workflows.

Mixed-Use | May 1, 2016

A man-made lagoon with a Bellagio-like fountain will be the highlight of a mixed-use project outside Dallas

Construction will soon begin on housing, retail, and office spaces.

Sports and Recreational Facilities | Apr 17, 2016

An expanded and renovated complex brings together U. of Colorado’s sports programs

This two-year project enhances the experiences of athletes and fans alike.

Sports and Recreational Facilities | Apr 13, 2016

Cubs take a measured approach when planning HD video boards

Along with the mammoth and super-sharp video boards, Wrigley Field's 1060 Project includes renovated bleachers, upgraded player amenities, and more concourses, decks, and concessions.

Sports and Recreational Facilities | Apr 13, 2016

More than a game: 4 ways sports teams are adapting to changing fan preferences

As the cost of tickets, parking, and concessions skyrockets, while home theater technology becomes more affordable, fans wonder: Why even bother going to the game? Here’s how progressive sports owners and Building Teams are packing stadium seats.

Sports and Recreational Facilities | Apr 11, 2016

Chicago Cubs continue Wrigley Field renovations with new clubhouse

The team found 30,000 sf of space underneath an old parking lot, nearly tripling the size of the old clubhouse. 

Sports and Recreational Facilities | Apr 6, 2016

Las Vegas debuts another new arena, with a number of ‘firsts’

The gambling mecca has its eyes on attracting a pro sports team. 

Sports and Recreational Facilities | Apr 5, 2016

The importance of true cost-modeling for sports facilities

Many factors prevent sports facilities from immediate profitability. Rider Levett Bucknall’s Peter Knowles and Steve Kelly write that cost modeling, the process of estimating construction expenses by analyzing fixed and variable expenses, can push facility development to financial success.

Sports and Recreational Facilities | Apr 1, 2016

San Diego Chargers announce plan for downtown stadium and convention center

The project will be funded primarily by a tax increase on hotel stays.  

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021