flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tokyo Olympic Stadium saga ends for Zaha Hadid

Sports and Recreational Facilities

Tokyo Olympic Stadium saga ends for Zaha Hadid

After resubmitting a bid, the firm will not design the main venue for the 2020 Olympics after all.


By Mike Chamernik, Associate Editor | September 21, 2015
Tokyo Olympic Stadium saga ends for Zaha Hadid

Zaha Hadid's original concept for Tokyo's Olympic Stadium. Rendering courtesy Zaha Hadid Architects

Zaha Hadid Architects will not compete to provide an alternative main stadium design for the 2020 Olympics, according to Construction Drive. The firm was unable to find a construction company to work with on the project.

Zaha Hadid designed the original Olympic Stadium concept in 2012. The 3.1 million-sf stadium drew attention for its futuristic design. It was set to hold track-and-field events and the opening and closing ceremonies.

After rising costs (from $1.3 billion to around $2 billion), construction delays, design issues, and other complaints from figures in the architectural world, Japan announced in July 2015 that the nation would drop Zaha Hadid and consider new proposals for a stadium.

Even after that, the firm introduced a new bid that it called “the most cost-effective delivery plan,” according to the AP. Zaha Hadid partnered with engineering company Nikken Sekkei for a new design, but couldn’t find a new contractor.

Related Stories

Sports and Recreational Facilities | Jan 25, 2018

Virginia Beach: A surf town with a wave problem no more

A world-class surf park will highlight Virginia Beach’s new live-work-play development.

Sports and Recreational Facilities | Dec 18, 2017

Canada’s newest funicular makes Edmonton’s largest green space more accessible

The incline elevator is located in downtown Edmonton and was publicly funded.

Sports and Recreational Facilities | Dec 15, 2017

Jefferson City’s new 80,000-sf recreation and wellness center

The facility will be co-managed by Lincoln University and the City of Jefferson – Parks, Recreation, and Forestry.

Sports and Recreational Facilities | Dec 6, 2017

An upscale RV camp breaks ground in Coos Bay, Ore.

The complex will include 180 campsites and a year-round clubhouse. 

Sports and Recreational Facilities | Dec 6, 2017

BIG-designed 1.3 million-sf sports and entertainment district includes Austin’s first pro-sports stadium

BIG is working in partnership with STG Design and Austin Sports & Entertainment on the project.

Sports and Recreational Facilities | Nov 27, 2017

The University of Memphis unveils the new home of the men’s basketball program

The Laurie-Walton Family Basketball Center will provide a strong commitment to donor and VIP cultivation.

Sports and Recreational Facilities | Nov 16, 2017

(UPDATED) Sasaki, Snøhetta, Studio T-Square, and HOK will lead the design of the Oakland A’s new stadium

The stadium is being planned for a piece of land that sits next to Lake Merritt near Downtown Oakland, surrounded by parkland and neighborhoods.

Giants 400 | Oct 23, 2017

Wooing jocks and fans

Colleges are going all out to optimize the fan experience and make the most of student athletes’ time.

Sports and Recreational Facilities | Oct 23, 2017

Top 50 sports construction firms

AECOM, Mortenson Construction, and Turner Construction Co. top BD+C’s ranking of the nation’s largest sports sector contractors and construction management firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Oct 20, 2017

Top 20 sports engineering firms

WSP, Walter P Moore, and ME Engineers top BD+C’s ranking of the nation’s largest sports sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021