flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 10 blog posts from 2013

Top 10 blog posts from 2013

A roundup of the most popular blog posts on BDCnetwork.com in 2013.


By BD+C Staff | December 31, 2013

BD+C editors and our contributors posted hundreds of blogs in 2013. Here's a recap of the most popular topics. They include valuable lessons from one of the first BIM-related lawsuits and sage advice from AEC legend Arthur Gensler.  

 

 

 

 

1. Lawsuit teaches valuable lesson on BIM and communication 

While browsing through some magazines on a flight, I read a cautionary tale about one of the first BIM-related lawsuits. The crux of the issue centered on the lack of communication between the architect, MEP engineer, and contractor. By Sasha Reed  Read the post.

 

 

2. Eight of history’s biggest design blunders

“Learn from the mistakes of others. You can’t live long enough to make them all yourself.” Eleanor Roosevelt’s famous quote rings true when one considers the many failures and resulting lessons learned in the history of architecture, engineering and design. By Cannon Design  Read the post.

 

 

3. Arthur Gensler to architects: Don't give away your ideas 

The founder of Gensler advises dozens of up-and-coming AEC professionals at BD+C's Under 40 Leadership Summit in San Francisco. By David Barista  Read the post.

 

 

4. Are these the '10 buildings that changed America'? Not likely

The other day we posted an announcement about PBS's upcoming special, "10 Buildings That Changed America." I don't pretend to be an architectural historian, but does anyone else think there are some unusual choices here? By Robert Cassidy  Read the post.

 

 

5. Brainstorming solutions to BIM implementation challenges – What hardware do you really need?

Even as more owners, agencies, and AEC firms are turning to BIM, it is impossible to ignore the fact that many of these organizations are still struggling with BIM implementation. By Sasha Reed  Read the post.

 

 

6. Three new insulation materials could be powerful solutions on commercial retrofits 

Three innovative insulation materials, including vacuum insulation panels and phase-change materials, could soon be used for commercial building retrofits in the U.S., as costs of these products fall and revamped local building codes allow their use. By Drew Ballensky  Read the post.

 

 

7. Does billing by the hour still make sense?

What’s an idea really worth? That’s the question posed by The New York Times in a provocative article that explores whether the notion of billing time still makes economic sense. By Steven Burns  Read the post.

 

 

8. BIM 2.0 and Google Glass: Science fiction or coming attractions for a job site near you?

Todd Wynne of Rogers-O’Brien Construction is one of only 8,000 people around the globe granted a pair of Google Glass for testing. Here's what he's been up to with the technology. By Sasha Reed  Read the post.

 

 

9. Better ways to manage PDF drawing sets – A customer's wish comes true

Sometimes in order to solve a challenge, you simply need walk around the problem and look at it from different angles. By Sasha Reed  Read the post.

 

 

10. Shuttered Pyramid arena in Memphis to be renovated for Bass Pro Shops

The vacant Pyramid arena in downtown Memphis will be transformed into a Bass Pro Shop. Instead of a 210-room hotel on three floors around The Pyramid's interior, Bass Pro Shops founder Johnny Morris is considering building 60 to 80 "cabins" inside the building. By Drew Ballensky  Read the post.

   

Related Stories

| Apr 24, 2014

Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum

LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.

| Apr 23, 2014

Ahead of the crowd: How architects can utilize crowdsourcing for project planning

Advanced methods of data collection, applied both prior to design and after opening, are bringing a new focus to the entire planning process.

| Apr 23, 2014

Developers change gears at Atlantic Yards after high-rise modular proves difficult

At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.

| Apr 23, 2014

Experimental bot transfers CAD plans onto construction sites

The Archibot is intended to take technical data and translate it into full-scale physical markings on construction sites.

| Apr 23, 2014

Mean and Green: Top 10 green building projects for 2014 [slideshow]

The American Institute of Architects' Committee on the Environment has selected the top ten examples of sustainable architecture and ecological design projects that protect and enhance the environment. Projects range from a project for Portland's homeless to public parks to a LEED Platinum campus center.

| Apr 23, 2014

Architecture Billings Index dips in March

The March ABI score was 48.8, down sharply from a mark of 50.7 in February. This score reflects a decrease in design services.

Sponsored | | Apr 23, 2014

Ridgewood High satisfies privacy, daylight and code requirements with fire rated glass

For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Norridge, Ill., the design team specified SuperLite II-XL 60 in GPX Framing for its optical clarity, storefront-like appearance, and high STC ratings.

| Apr 22, 2014

Transit-friendly apartment building now under construction

The new $44 million community is situated on eight acres, directly adjacent to the local Park-n-Ride, and a quick walk from a nearby light rail station.

| Apr 22, 2014

Bright and bustling: Grimshaw reveals plans for the Istanbul Grand Airport [slideshow]

In partnership with the Nordic Office of Architecture and Haptic Architects, Grimshaw Architects has revealed its plans for the terminal of what will be one of the world's busiest airports. The terminal is expected to serve 150 million passengers per year.

| Apr 21, 2014

10 design-build best practices

Design-build requires more than a good contract and appropriate risk allocation, says the DBIA. Everyone from the owner to the subcontractors must understand the process, the expectations, and fully engage in the collaboration. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021